Skip to the record
For the highest quality transcripts.

Council archive · source document

Module 10 · OPW16/0098

Attached to the e-mail OPW16/0098 - Operational Works Application.

of 16

Text shows just the words. Original shows the document exactly as it was published.

 Performance outcomes                          Acceptable outcomes                                               Response    Comment
 (1) an increase in the risk of flooding or    AO12.2 The design, construction and operation of artificial       N/A
     erosion                                   tidal waterways does not increase risk from flooding.
 (2) degradation of water quality
                                               AND
 (3) degradation and loss of matters of
     state environmental significance          AO12.3 The design, construction and operation of an               N/A
     (including, but not limited to, coastal   artificial waterway in connection with the reconfiguration of
     wetlands, fish habitat areas and          a lot ensures:
     migratory species habitat).               (1) water inlet and outlets structures are of sufficient
                                                     capacity to maintain the water quality within the
                                                     waterway
                                               (2) water discharged from the artificial waterway protects
                                                     the environmental values and water quality objectives
                                                     of the receiving waters
                                               (3) dredged material is not disposed of to tidal water
                                                     beyond the artificial waterway unless there is a
                                                     beneficial reuse, e.g. beach nourishment.

                                               Editor’s note: For more information on environmental values and
                                               water quality objectives see Schedule 1 of the Environment
                                               Protection (Water) Policy 2009.


                                               AND
                                               AO12.4 The location of the artificial waterways avoids            N/A
                                               matters of state environmental significance, or does not
                                               result in any significant adverse impact on matters of state
                                               environmental significance.

 PO13 Development does not involve             No acceptable outcome is prescribed.                              N/A
 reclamation of land below tidal water,
 other than for the purposes of:
 (1) coastal-dependent development,
      public marine development or
      community infrastructure
 (2) strategic ports, boat harbours or
      strategic airports and aviation
      facilities, in accordance with a
      statutory land use plan, where there
      is a demonstrated net benefit for the
      state or region and no feasible
      alternative exists




State development assessment provisions                                         Module 10 — Coastal protection          10.1 Tidal works, or development in a coastal management district state code
10 October 2014 V1.5                                                                                                                                                              Page 11 of 16

Used in these records

About this file

File size
198 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Module 10.pdf · 198 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.