Skip to the record
Accept no substitutions.

Council archive · source document

Module 10 · OPW16/0098

Attached to the e-mail OPW16/0098 - Operational Works Application.

of 16

Text shows just the words. Original shows the document exactly as it was published.

 Performance outcomes                            Acceptable outcomes                                            Response    Comment
 (3) coastal protection work or work
     necessary to protect coastal
     resources or physical coastal
     processes.



 Table 10.1.2: Operational work
 Performance outcomes                            Acceptable outcomes                                            Response    Comment
 PO1 Tidal works that is private marine          AO1.1 The location and design of tidal works that is           N/A
 development does not result in adverse          private marine development:
 impacts to tidal land.                          (1) is on private land abutting tidal water and used for
 Editor’s note: In addressing this performance        property access purposes
 outcome, the applicant should also have         (2) occupies the minimum area reasonably required for
 regard to requirements for private marine
                                                      its designed purpose
 development in the prescribed tidal works
 code in the Coastal Protection and              (3) is not to be roofed or otherwise covered
 Management Regulation 2003.                     (4) does not require the construction of coastal protection
                                                      works, shoreline or riverbank hardening or dredging
 Editor’s note: Applications should be                for marine access
 supported by a report certified by an RPEQ to   (5) does not adversely impact on public safety or public
 demonstrate compliance with this performance
 outcome.
                                                      access and use of the foreshore.
 PO2 Development does not result in the          No acceptable outcome is prescribed.                           N/A
 disposal of material dredged from an
 artificial waterway into coastal waters,
 with the exception of:
 (1) reclamation works, or
 (2) coastal protection works, or
 (3) the maintenance of an existing
       artificial waterway and the at-sea
       disposal of material that has
       previously been approved for the
       waterway.
 PO3 The design and construction of an           AO3.1 The design and construction of the artificial            N/A
 artificial waterway maintains coastal           waterway provides for sand bypassing where this is
 landforms.                                      necessary to prevent erosion of adjacent coasts and
                                                 minimise sedimentation of the waterway.
                                                 AND
                                                 AO3.2 Clean sand accumulating within an artificial             N/A
                                                 waterway is returned to the active beach system, in
                                                 preference to disposal on land.


State development assessment provisions                                        Module 10 — Coastal protection          10.1 Tidal works, or development in a coastal management district state code
10 October 2014 V1.5                                                                                                                                                             Page 12 of 16

Used in these records

About this file

File size
198 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Module 10.pdf · 198 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.