Attached to the e-mail OPW16/0098 - Operational Works Application.
Performance outcomes Acceptable outcomes Response Comment
event, including consideration of the capacity of the
route to support the evacuation of the entire local
population within a reasonably short timeframe (for
example, 12 hours).
AND
AO2.3 Development within a coastal hazard area is P/S The proposed works can easily be removed or maintained,
located, designed and constructed to ensure exposed as required. Structure is expected to be stable for velocities
structures can sustain flooding from a defined storm tide of 1.5 – 2.0m/s however comprehensive flood modelling has
event. not been undertaken to accurately determine design
AND conditions at the structure and would be excessive for a trial
structure.
AO2.4 Essential community service infrastructure is: N/A
(1) located so that it is not inundated by a recommended
storm tide event specified for that infrastructure, or
(2) located and designed to ensure any components of
the infrastructure that are likely to fail to function or
may result in contamination when inundated by a
storm tide (for example, electrical switch gear and
motors, water supply pipeline air valves) are:
(a) located above the peak water level for a
recommended storm tide event, or
(b) designed and constructed to exclude storm tide
intrusions or infiltration (including by being
located in the ground), or
(c) able to temporarily stop functioning during a
recommended storm tide event without causing
significant adverse impacts to the infrastructure
or the community.
AND
AO2.5 Emergency services infrastructure and emergency N/A
shelters, police facilities, and hospitals and associated
facilities have an emergency rescue area above the peak
water level for a recommended storm tide event.
PO3 Development directly, indirectly and AO3.1 Development avoids increasing the number of N/A
cumulatively avoids an unacceptable premises from which people would need to be evacuated
increase in the severity of the coastal to prevent death or injury from a defined storm tide event.
hazard, and does not significantly
increase the potential for damage on the
premises or to other premises.
State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code
10 October 2014 V1.5 Page 2 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Module 10.pdfRelated documentApplication case desk ↗
About this file
- File size
- 198 KB (small file)
- File type
No other editions are linked here.