Skip to the record
Every meeting, every word.

Original source · versioned page text

Attachment 5 - Bushfire Management Plan - 02 December 2019

of 33

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (11.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
Report on Updated Bushfire Management Plan for                       Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic

   •   This final development will provide extensively improved bushfire safety for the
       existing developments and the new areas.


6.2 Specific Outcomes
13.33–04                                  − The proposed use does not compromise the safety of
(General)                                   people or property from bushfire. The detailed set of
                                            mitigating actions provides for a very safe environment
                                          − Complies

13.34-07/013                              − The provision of separation buffers of up to 20 metres
(Siting, Design and                         from adjoining vegetation along with the capacity to
Construction)                               construct all building to a construction standard under
                                            AS3959 has been demonstrated. i.e. max. of BAL 29
                                          − Complies
13.35-08                                  − The provision of fire hydrants exclusively for firefighting
(Water)                                     confirms a strong response capacity for firefighting
                                            appliances.
                                          − The entire site has a reticulated water supply with
                                            appropriate fire hydrants.
                                          − Complies
13.36-09                                  − The proposed network of vehicular access provides
(Vehicle Access and Fire                    excellent access for emergency vehicles.
Trails)                                   − Complies
13.37-010                                 − The development nodes when cleared will be low
(Reconfiguring a Lot)                       bushfire risk areas and enhance the overall safety for
                                            the entire development.
                                          − Complies




  19-001 Updated Report 2 December 2019                                    Commercial-in-Confidence
                                                                                            Page 8
Log in to download the original file

Attachment 5 - Bushfire Management Plan - 02 December 2019.pdf · 11.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.