Original source · versioned page text
Attachment 5 - Bushfire Management Plan - 02 December 2019
Plans and drawings: the text below has words only, no drawings.
Very large file (11.8 MB): may take a few minutes to open.
Report on Updated Bushfire Management Plan for Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic
It is normal practice to reduce the bushfire hazard and risk in line with meeting Council’s
Bushfire Overlay Code. The retention of Lots 3 and 7 only add a minor risk because of
their small size and the presence of surrounding access provides a most acceptable
outcome.
5.4.2 External
• The patch of vegetation north of Area 2 in the National Park should be considered
for a cooperative hazard reduction burn with National Parks. This would only be
needed on a once in 7-10 year cycle. (This has been discussed with a local
National Parks Ranger and has received his support.) This is not required for this
ROL nevertheless is good practice.
• The entire Park area south to Eenie Creek should also have management that
would include hazard reduction burning. This is not required for this ROL
nevertheless is good practice.
5.5 Construction Standards
The provision of low threat separation up to 20 metres with access and adjoining
vegetation with fuel loads of 20+tonnes/ha will confirm that proposed uses will be
constructed to Bushfire Attack Levels (BAL) under AS3959-2018 of 29 and less for those
lots with greater separation distances. (This applies to Area 2 which is proposed for
residential development.)
The final development on Area 2 will include the provision of a safe emergency assembly
area in the centre of the lot. This will provide added assurance that all people are safe
and then can be evacuated if necessary.
6. Compliance with Natural Hazards Overlay Code
(13.28 of the Noosa Plan)
6.1 Overall Outcomes
• The previously approved development provided actions that had minimal ecological
impact, allowed a safe environment for people and property and sufficient capacity
for bushfire response if required.
19-001 Updated Report – 2 December 2019 Commercial-in-Confidence
Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.