ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
UNITYWATER
Important Advisory Note - The following Unitywater conditions are applied in
accordance with the Chapter 4c, part 7 and sections 135 and 140(c) South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect which
are taken to be a water approval for a staged connection. You are entitled to appeal
against the water connection aspects of this application in accordance with section
99BRAY and Chapter 4c, part 4, Divisions 1 and 2 of the South East Queensland
(Distribution and Retail) Restructuring Act 2009. Unitywater can be contacted as
follows:
Phone: 1300 0 Unity (1300 086 489)
Email: [email protected]
Web: www.unitywater.com.
Water Connections
21. Reticulated water must be provided to each lot in the development. This
must include:
a. Ensuring that existing internal water pipes are wholly contained
within the lot they will serve;
b. An approved water meter for each lot in accordance with Unitywater
and SEQ Standard Drawings;
c. Provision of a water service from the existing 150 mm diameter
water main that runs across the lot to service all proposed and
future lots in accordance with Unitywater and SEQ Standard
Drawings.
22. Tree plantings must maintain a minimum horizontal clearance of 1.0
metre from Unitywater water mains. Landscaping plants within these
clearances must be low growing when mature and suitable Unitywater
approved varieties.
23. Written approval to enter and construct must be obtained from the owners
of properties through which external water mains will traverse. This must
include approval for a 3 meter wide easement over the mains, and be
submitted with lodgement of the associated development application for
Operational Works.
24. Construction works undertaken in the vicinity of Unitywater water supply
or sewerage infrastructure must not adversely affect the integrity of the
infrastructure. All costs associated with repair, replacement or alteration
of infrastructure must be met by the applicant.
ADVISORY NOTES
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit
where it is required. Council will not be able to issue a Decision Notice
without receipt of details that the Levy has been paid. QLeave contact:
1800 803 481 (free call) or (07) 3212 6855.
Unitywater
2. Connection to the Unitywater live water supply and live sewerage system
must be undertaken by Unitywater at the applicant’s cost.
B. Apply the following property note to new Lot 2:
1. Building Envelope/s have been specified for this property for the
construction of a house or any habitable buildings. Details can be
obtained from Council.
Page 26 of 27