Original source · versioned page text
Landscape Technical Specification - OPW14/0197
Attached to the e-mail Doonella Stage C (Email 7 of 7) Landscape Technical Specification & Transmittal - OPW14/0197.
Doonella – Stage C
Ready for planting.
7.5.4 TOPSOIL DEPTHS
Spread imported topsoil to planting areas to a depth of 300mm.
7.6 FERTILISER
A qualified Horticulturist shall provide a fertilising regime for landscape works based on the results of the
soil tests.
The Contractor shall provide proprietary fertilisers in accordance with the Horticulturist’s recommendations,
delivered to the site in sealed bags marked to show manufacturer or vendor, weight, fertiliser type, N:P:K
ratio, recommended uses and application rates.
END OF SECTION
AECOM 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.