Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Landscape Technical Specification - OPW14/0197

Attached to the e-mail Doonella Stage C (Email 7 of 7) Landscape Technical Specification & Transmittal - OPW14/0197.

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Doonella – Stage C
                    Ready for planting.


7.5.4    TOPSOIL DEPTHS

Spread imported topsoil to planting areas to a depth of 300mm.




7.6      FERTILISER

A qualified Horticulturist shall provide a fertilising regime for landscape works based on the results of the
soil tests.

The Contractor shall provide proprietary fertilisers in accordance with the Horticulturist’s recommendations,
delivered to the site in sealed bags marked to show manufacturer or vendor, weight, fertiliser type, N:P:K
ratio, recommended uses and application rates.




                                              END OF SECTION




AECOM                                         4
Log in to download the original file

Landscape Technical Specification - OPW14_0197.pdf · 151 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.