Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Landscape Technical Specification - OPW14/0197

Attached to the e-mail Doonella Stage C (Email 7 of 7) Landscape Technical Specification & Transmittal - OPW14/0197.

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Doonella – Stage C
9.5.9    SIZE AND FORM REQUIREMENTS

At the time of delivery all plants shall conform to the specified minimum size and nominated container size,
confirmed in the Plant Schedule.

Plants shall be grown, maintained, pruned and fertilised to produce a specimen at delivery conforming to
the detail and description contained in the Plant Schedule. This shall include root pruning to advanced
stock for a minimum 12-week period prior to delivery to site. Rootball dimensions should be appropriate to
the planter into which they will be installed.




9.6      PRODUCTION AND MAINTENANCE GENERALLY

The plants shall be watered, fertilised, and treated for pests and diseases all as necessary to maintain
continuing healthy growth. An approved pruning programme shall be carried out regularly during the
Establishment Period to promote trunk and foliage canopy formation in trees all as directed by the
Superintendent.

All plants must have the approval of the Superintendent before delivery to site.

9.6.1    MAINTENANCE IN TRANSIT

All plant material must be protected from the adverse effects of the elements during handling and transport.
Plants shall be transported in fully enclosed pan technician type trucks.

During transit from the nursery to the site, monitor the plants to ascertain that undue movement or
disturbance is not occurring and that moisture levels are suitable to ensure plant health.

9.6.2    LOCATIONS

If it appears necessary to vary plant locations and spacings to avoid service lines, or to cover the area
uniformly, or for other reasons, seek approval from Superintendent before varying plant locations.

9.6.3    PLANTING CONDITIONS

Do not plant in unsuitable weather conditions such as extreme heat, cold, wind or rain. In other than sandy
soils, suspend excavation when the soil is wet, or during frost periods. Refer to Plant Specification for palm
requirements.

9.6.4    WATERING

Thoroughly water the plants before planting, immediately after planting, and as required to maintain growth
rates free of stress.




9.7      PLACING

Remove the plant from the container with minimum disturbance to the root ball, ensure that the root ball is
moist and place it in its final position, in the centre of the hole and plumb, and with the top soil level of the
plant root ball level with the finished surface of the surrounding soil.

9.7.1    BACKFILLING

Backfill with topsoil mixture. Lightly tamp and water to eliminate air pockets. Ensure that topsoil is not
placed over the top of the root ball, so that the plant stem remains the same height above ground as it was
in the container.




AECOM                                          8
Log in to download the original file

Landscape Technical Specification - OPW14_0197.pdf · 151 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.