Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Landscape Technical Specification - OPW14/0197

Attached to the e-mail Doonella Stage C (Email 7 of 7) Landscape Technical Specification & Transmittal - OPW14/0197.

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Doonella – Stage C


11. IRRIGATION



11.1 PROJECT SCOPE

Note:

There is no formalised irrigation system as part of this stage of landscape works. During construction and
throughout the maintenance phase of the project, the contractor is to carry out watering to ensure the
longevity of the softscape. Refer Tender Schedule for specific duration and allowances for water truck use.




                                            END OF SECTION




AECOM                                       13
Log in to download the original file

Landscape Technical Specification - OPW14_0197.pdf · 151 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.