Original source · versioned page text
Landscape Technical Specification - OPW14/0197
Attached to the e-mail Doonella Stage C (Email 7 of 7) Landscape Technical Specification & Transmittal - OPW14/0197.
Doonella – Stage C Responsibilities and duties of the Principal, Contractor and Contract Superintendent are not altered by requirements in referenced documents. 1.7 MATERIALS & WORKMANSHIP Where specified, materials which are not available or cannot reasonably be provided in time to meet the program, the Superintendent will permit substitutions for such materials provided that applications for substitution is made as soon as it is known that specified materials are unavailable. The Superintendent shall approve substitutions if the Superintendent is satisfied that the proposed substitute is satisfactory for the purpose intended. Unless otherwise specified, manufactured items to be used in the work under the contract are to be used in accordance with current recommendations published by the manufacturer. Workmanship shall be the best of its respective kind and conform to the best practices of the trade. Only suitably qualified persons shall perform work on this project relevant to their area of expertise. 1.8 INSPECTION Minimum of 24 (twenty-four) hours notice for inspections to be made. 1.9 ENVIRONMENTAL PROTECTION NOISE CONTROL The Contractor is required to take all practical precautions to minimise noise resulting from work under the Contract. Fit all motorised construction equipment with noise suppressors and use so that noise is minimised. Do not use loud hailers. Wet saws are to be used to cut pavers, within a suitable enclosure to the approval of the Superintendent. Wet cutting to be in accordance with Engineering Guidelines for Queensland Construction Sites: Soil Erosion & Sediment Control (1996). DUST CONTROL Minimise air-borne dust arising from the performance of the works under the Contract. Dust control as in accordance with The International erosion Control Association Guidelines (1993). As in accordance with Engineering Guidelines for Queensland Construction Sites: Soil Erosion & Sediment Control (1996). WATER QUALITY Water quality to be maintained. Sampling of water quality is to be undertaken if directed by the Superintendent, in accordance with the Department of Environment: Water Quality Sampling Manual, Queensland Department of Environment and Heritage (1995) and The Queensland Department of Natural Resources (DNR) Riverine Environmental Protection Act (1997). As in accordance with Engineering Guidelines for Queensland Construction Sites: Soil Erosion & Sediment Control (1996), Environmental Protection Act (1994), and Environmental Protection (Water) Policy (1994) and Guidelines for Managing Environmental Risks Associated with Construction Activities (ICC) CLEAN PLANT & EQUIPMENT Ensure that the wheels, tracks and body surface of all vehicles and plant entering and leaving the site are free of soil, organic material and pathogens. Ensure that soil, organic material and pathogens do not contaminate the site or surrounding properties, as in accordance with Engineering Guidelines for Queensland Construction Sites: Soil Erosion & Sediment Control (1996). OZONE PROTECTION Minimise the use of chlorofluorocarbons, halons and other compounds directly implicated in depletion of the ozone layer. As in accordance with Engineering Guidelines for Queensland Construction Sites: Soil Erosion & Sediment Control (1996). SOIL EROSION CONTROL Minimise erosion of soil from any lands used or occupied in the performance of the work under the contract. Soil erosion controls and measures to be in accordance with Engineering Guidelines for Queensland Construction Sites: Soil Erosion & Sediment Control (1996), Environmental Protection Act (1994), and Environmental Protection (Water) Policy (1994). FIRE RESTRICTIONS No fires are to be lit. AECOM 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.