Landscape Technical Specification - OPW14/0197
Attached to the e-mail Doonella Stage C (Email 7 of 7) Landscape Technical Specification & Transmittal - OPW14/0197.
Doonella – Stage C
1.2 EXCLUDED WORKS
All works described in this specification and on the drawings shall be carried out by the contractor, those
works required by regulation or law to be carried out by other authorities (water connections, electrical
certifications, etc) shall be engaged directly by the contractor. The contractor shall pay for all fees and
charges for such work.
1.3 DEFINITIONS
The terms ‘directed’, ‘selected’, ‘required’ and ‘approved’ mean directed, selected, required and approved
by the Superintendent unless expressly specified otherwise.
Unless the contract otherwise requires, the following definitions apply:
Head Contract: “Head contract” shall mean contract to which the contractor is
nominated as subcontractor. The head contract is under and
being performed under AS4000
Supply: “Supply”, “furnish” and similar expressions mean “supply only”.
Provide: “Provide” and similar expressions mean “supply and install”.
Approved: “Approved”, “reviewed”, “directed”, “endorsed” and similar
expressions mean “approved (reviewed, directed, rejected,
endorsed) in writing by the contract administrator.”
Give Notice: “Give notice”, “submit”, “advise”, “inform” and similar
expressions mean “give notice (submit, advise, inform) in writing
to the contract administrator”.
Proprietary: “Proprietary” means identifiable by naming manufacturer,
supplier, installer, trade name, brand name, and catalogue or
reference number.
Samples: Includes samples, prototypes and sample panels.
NATA: National Association of Testing Authorities.
1.4 CONSTRUCTION OF WORKS
Work may be performed between the hours of 7.00am and 6.00pm Monday to Friday and 8.00am to noon
Saturday. Work can be performed outside these hours with the written approval of the Superintendent.
Work on Sunday will not normally be approved.
1.5 CONSTRUCTION PROGRAM
A construction program is to be submitted to the Superintendent prior to commencement of work for
approval no less than seven (7) days following notification of being awarded the contract.
Construction program will clearly indicate the following information on a weekly basis:
Project Milestones
Critical path of construction
Tasks
Progress
The Contractor is to ensure the work is organised, sequenced, and implemented in a manner which
eliminates unreasonable disturbance to the site, property and disruption to continuing property users, and
access.
1.6 REFERENCED DOCUMENTS
Use latest editions of referenced documents and refer to any amendments. Other editions or amendments
required by statutory authorities will take precedence over referenced documents.
AECOM 2