SERVICES & ORGANISATION COMMITTEE MEETING 8 AUGUST 2023
It is important to note that the financial summary provided in this report is subject to timing and
reported accruals (i.e. a major project funded over multiple years may be significantly closer to
completion than the 2022/2023 financials may indicate).
The report does not address disaster recovery project, which will be subject to separate reporting
1. Current Projects
The major focus in the 3rd quarter of the 22/23 financial year has been:
Continuing various stages of • Tewantin, NDSC Stage 1 McKinnon Drive -
construction of major projects: Community Sports Complex
• Peregian Beach, Living Fire Tech Lab - Disaster
Rec Cat D
• Federal, Middle Creek Road - Reconstruction
• Noosa Heads, Dog Beach - SEMP
• Sunrise Beach, Sobraon Street - Slope
Stabilisation
• Black Mountain, Lawnville Road - Bridge
Renewal
• Tewantin, Sundial Park - BMX Pump Track
Upgrade
• Sunshine Beach, Adams Street - Land Slip
Design
Emergent works within • Sunrise Beach Shopping Centre - Shop Fit Out
2022/2023 financial year:
• Boreen Point Campground - Storage Shed
Replacement
• Sunshine Beach, Adams Street - Land Slip
Design
• Peregian Beach, Digital Hub - Office Fit-Out
• Noosa Northshore Campground - Wastewater
System Renewal
• Noosa River Holiday Park - Access Ramp
Renewal
• Noosa Leisure Centre - Replacement of
External Emergency Exit Doors
• Noosa North Shore - Wastewater System
• The J - Airconditioning Condenser Unit
Replacement
Review of tender submissions • Shire Wide, Pathway Program
for major projects budgeted for
construction delivery this • Noosaville, Foreshore Masterplan
financial year:
• Noosa Heads, Arkana Drive - Median Strip
Stabilisation
Page 8 of 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.