                                                                    Officer:            Mark Lewis
                                                                    Direct Telephone:   07 53296290
                                                                    Our Reference:      OPW23/0179
                                                                    Your Reference:     220508

                 13 December 2023


                 CE Cullen & M Cullen
                 C/- DME Projects
                 POBox 7481
                 SIPPY DOWNS QLD 4556
                 [email protected]



                 Dear Sir
                                                   Information Request
                                                       Planning Act 2016

                 I refer to your application and advise that Council requires further information to satisfactorily
                 assess the proposal.
                 1.      APPLICATION DETAILS

                   Application No.               OPW23/0179

                   Street Address:               128 Gympie Tce Noosaville Qld 4566

                   Real Property Description:    Lot 1 MCH 3881

                   Planning Scheme:              Noosa Plan 2020 (25 September 2020)

                 2.      INFORMATION REQUIRED

                 The information requested is set out below:
                 Issue
                 The applicant has not fully demonstrated compliance with conditions of the higher order
                 approval MCU22/0171.
                 Information Required
                  i.     Provide the amended plans as described in Condition 2
                 ii.     Provide the bond as described in Condition 6. It is noted that the bond must be received
                         prior to the issue of the subject operational works approval.
                 iii.    Demonstrate compliance with Condition 24 – Waste Management
                 Issue
                 Council has concerns that the proposed contiguous pile wall will impact on the ability to provide
                 dense deep landscaping around the building. It is noted that the development of the adjoining
                 site has recently installed drilled/driven sheet piling.
                 Information Required
                 2.      Provide further advice on the proposed retaining wall methods to be employed on site.
                         If an alternate method to contiguous piles is proposed, provide amended plans.

                                                PO Box 141                   P. (07) 5329 6500        [email protected]
                                                TEWANTIN QLD 4565            F. (07) 5329 6501        www.noosa.qld.gov.au
                                                                                                                 Page 1 of 3
Document Set ID: 22730091
Version: 2, Version Date: 15/12/2023
Full text of the other 2 pages

Page 2

                 Issue
                 Flooding and access to the basement. The driveway ramp to the basement does not
                 incorporate the required 300mm freeboard above the defined flood level (DFE).
                 Information Required
                 3.       Amend the driveway and access design to ensure that 300mm freeboard above the DFE
                          is achieved for all openings to the basement or provide a passive flood barrier system
                          which will achieve the equivalent level of protect and flood immunity for the basement.
                 Issue
                 The submitted dewatering management plan requires amendment.
                 Information Required
                 4.       Provide an updated dewatering management plan that includes the following:
                         i.   The DMP states that the shoring design is provided in Appendix C – however only
                              the civil engineering plans are provided. Include plans which show the location and
                              type of temporary shoring, groundwater spears, treatment and monitoring equipment
                              location and space requirements. Why do the structural engineering plans (provided
                              separately) only show shoring on 3 sides of the excavation? The type of CFA piling
                              (contiguous or secant) should also be stated on plan
                        ii.   Remove references to ‘steel sheet piling’ on page 10 and refer to CFA secant piling.
                              Please note that the references should reflect the proposed method or the alternate
                              method chosen by the civil engineer.
                       iii.   Update section 6.5.2 and 6.5.3 (Water Quality Monitoring) to include continuous
                              monitoring of pH and dissolved oxygen at the release point from the treatment
                              system. Total iron and aluminum are to be sampled where identified in the document
                              as ‘if required’.
                       iv.    Update the figure in Appendix A to also show the stormwater network and specifically
                              the stormwater pit which the dewatering system will discharge into and the outlet
                              headwall.
                        v.    Update section 6.4.3 to identify that discharge is to the stormwater network prior to
                              entering the canal system.
                       vi.    There seems to be plenty of room in the frontage of the site for establishing a
                              groundwater monitoring bore outside of the excavation and shoring system in which
                              to monitoring groundwater drawdown and quality. Update the monitoring section of
                              the DMP to incorporate such a monitoring location.
                      vii.    Section 7 (Noise) is to be updated to refer to the default noise standard for pumps
                              in Section 440T of the EPAct. The EEP (Noise) objectives currently referenced are
                              long-term objectives rather than a specific enforceable standard.
                      viii.   Provide dilapidation reports for neighbouring properties and any other structures or
                              infrastructure identified as being within the estimated cone of depression associated
                              with the groundwater drawdown.
                 Issue
                 A number of the submitted engineering plans are stamped “not for construction” and have not
                 been signed by the RPEQ.




                                                                                                           Page 2 of 3
Document Set ID: 22730091
Version: 2, Version Date: 15/12/2023

Page 3

                 Information Required
                 5.     Provide amended plans that are for approval and construction and are signed by the
                        RPEQ.
                 3.     DUE DATE FOR RESPONSE TO INFORMATION REQUEST

                 The due date for providing the requested information is 13 March 2024. Email your response
                 to [email protected]. Please advise Council of your response to this information request
                 in accordance with section 13 of the Development Assessment Rules.
                 If you do not provide a response before the due date, it will be taken as if you have decided
                 not to respond to the information request and Council will continue with the assessment of
                 your application.
                 4.     OTHER DETAILS

                 You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
                 Services” page can be accessed via "Quick Links" on the left hand side of the screen.
                 Should you have any further queries in relation to the above, please do not hesitate to contact
                 me on the number above.
                 Yours faithfully,




                 Mark Lewis
                 Coordinator Engineering




                                                                                                        Page 3 of 3
Document Set ID: 22730091
Version: 2, Version Date: 15/12/2023

Used in these records

About this file

File size
113 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Information Request OPW23 0179.pdf · 113 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.