Issue
Flooding and access to the basement. The driveway ramp to the basement does not
incorporate the required 300mm freeboard above the defined flood level (DFE).
Information Required
3. Amend the driveway and access design to ensure that 300mm freeboard above the DFE
is achieved for all openings to the basement or provide a passive flood barrier system
which will achieve the equivalent level of protect and flood immunity for the basement.
Issue
The submitted dewatering management plan requires amendment.
Information Required
4. Provide an updated dewatering management plan that includes the following:
i. The DMP states that the shoring design is provided in Appendix C – however only
the civil engineering plans are provided. Include plans which show the location and
type of temporary shoring, groundwater spears, treatment and monitoring equipment
location and space requirements. Why do the structural engineering plans (provided
separately) only show shoring on 3 sides of the excavation? The type of CFA piling
(contiguous or secant) should also be stated on plan
ii. Remove references to ‘steel sheet piling’ on page 10 and refer to CFA secant piling.
Please note that the references should reflect the proposed method or the alternate
method chosen by the civil engineer.
iii. Update section 6.5.2 and 6.5.3 (Water Quality Monitoring) to include continuous
monitoring of pH and dissolved oxygen at the release point from the treatment
system. Total iron and aluminum are to be sampled where identified in the document
as ‘if required’.
iv. Update the figure in Appendix A to also show the stormwater network and specifically
the stormwater pit which the dewatering system will discharge into and the outlet
headwall.
v. Update section 6.4.3 to identify that discharge is to the stormwater network prior to
entering the canal system.
vi. There seems to be plenty of room in the frontage of the site for establishing a
groundwater monitoring bore outside of the excavation and shoring system in which
to monitoring groundwater drawdown and quality. Update the monitoring section of
the DMP to incorporate such a monitoring location.
vii. Section 7 (Noise) is to be updated to refer to the default noise standard for pumps
in Section 440T of the EPAct. The EEP (Noise) objectives currently referenced are
long-term objectives rather than a specific enforceable standard.
viii. Provide dilapidation reports for neighbouring properties and any other structures or
infrastructure identified as being within the estimated cone of depression associated
with the groundwater drawdown.
Issue
A number of the submitted engineering plans are stamped “not for construction” and have not
been signed by the RPEQ.
Page 2 of 3
Document Set ID: 22730091
Version: 2, Version Date: 15/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Request OPW23 0179.pdfRelated documentApplication case desk ↗
About this file
- File size
- 113 KB (small file)
- File type
No other editions are linked here.