Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable) ASSESSMENT
provided – linkages and pathways link to the Local and Regional Cycle upgraded where required.
a) to form an integrated component of Network and to the Priority Infrastructure Plan in Part 15.
the movement network and the open
space system; S5.2 Direct and accessible linkages are provided into the
b) to encourage walking and cycling; site.
c) to add variety and visual interest;
d) to conserve street trees, vegetation S5.3 Pathway and landscape works are provided to a high
and other significant features; standard to Council specifications and assessed for
e) to allow equitable access to public compliance with local government cycling facility design
areas and community facilities; standards.
f) with adequate lighting where subject
to high night time usage; S5.4 Pathways are provided to cater for shared use and
g) in locations where there is casual cater for both commuting and recreational usage and
surveillance; exceed minimum standards.
h) or widened at potential conflict points;
i) to incorporate—
j) street tree planting to enhance the
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.