Appendix E - Local Code Response

Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).

of 162

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS (if code assessable)                    ASSESSMENT

                  onto properties;

        iii.      a corridor allocated for

                  services and utilities; and iv.

                  additional amenity for minor

                  roads.

O8 Stormwater drainage infrastructure is            S8.1 Stormwater drainage planning, design and              O8 Complies
                                                                                                               The proposed Stormwater Management
planned, designed and constructed to—               construction is in accordance with Section 4 of PSP5
                                                                                                               Plan complies with the PSP5 Engineering
    a) be accessible, cost effective and            Engineering Design Standards – Roads, Drainage and
                                                                                                               Design Standards – Roads, Drainage &
        easily maintainable;                        Earthworks; AND
                                                                                                               Earthworks and the Queensland Urban
    b) protect downstream capacity;                                                                            Drainage Design Manual.

    c) protect downstream water quality;            S8.2 As Constructed data is submitted in accordance with

                                                    Section 6 of PSP5 Engineering Design Standards – Roads,
    d) maximise on-site stormwater retention
                                                    Drainage and Earthworks; AND
        and retardation; and

    e) convey run-off to stormwater drainage

        in a manner that allows roads to be         S8.3 Stormwater drainage planning, design and

        trafficable in Q100 ARI local rainfall      construction is in accordance with the Queensland Urban

        events.                                     Drainage Design Manual.
Log in to download the original file

Appendix E - Local Code Response.pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.