Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable) ASSESSMENT
onto properties;
iii. a corridor allocated for
services and utilities; and iv.
additional amenity for minor
roads.
O8 Stormwater drainage infrastructure is S8.1 Stormwater drainage planning, design and O8 Complies
The proposed Stormwater Management
planned, designed and constructed to— construction is in accordance with Section 4 of PSP5
Plan complies with the PSP5 Engineering
a) be accessible, cost effective and Engineering Design Standards – Roads, Drainage and
Design Standards – Roads, Drainage &
easily maintainable; Earthworks; AND
Earthworks and the Queensland Urban
b) protect downstream capacity; Drainage Design Manual.
c) protect downstream water quality; S8.2 As Constructed data is submitted in accordance with
Section 6 of PSP5 Engineering Design Standards – Roads,
d) maximise on-site stormwater retention
Drainage and Earthworks; AND
and retardation; and
e) convey run-off to stormwater drainage
in a manner that allows roads to be S8.3 Stormwater drainage planning, design and
trafficable in Q100 ARI local rainfall construction is in accordance with the Queensland Urban
events. Drainage Design Manual.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.