Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable) ASSESSMENT
O9 Roads and stormwater drainage S9.1 Roads and stormwater drainage infrastructure is O9 Complies
The construction of the proposed
infrastructure is constructed— constructed in accordance with—
development will comply with the PSP5
a) in accordance with appropriate a) Sections 2, 3 and 4 of PSP5 Engineering Design
Engineering Design Standards – Roads,
engineering standards; and Standards – Roads, Drainage and Earthworks; Drainage & Earthworks, the Queensland
b) to minimise adverse environmental b) Queensland Design Code for Residential Streets; Design Code for Residential Streets,
impacts, including from run-off and AUSTRAROADS and the Erosion and
c) AUSTROADS; or
sediment control guidelines of Engineers
erosion.
d) A combination of the principles in these documents; Australia (Queensland Division)
AND
S9.2 Erosion and sediment control measures are designed
and implemented in accordance with the Institution of
Engineers Australia (Queensland Division) Soil Erosion and
Sediment Control - Guidelines for Queensland Construction
Sites.
Environmental Protection
O10 Roads and stormwater drainage S10.1 Roads and stormwater drainage follow the edge of S10.1 Complies
The proposed Stormwater Management
infrastructure are located and aligned so as existing disturbed areas, or alternatively, these works are
Plan is based on the Water Sensitive Urban
to— co-located within a combined utility corridor; AND
Design (WSUD) approach. This approach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.