Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable) ASSESSMENT
S10.5 Low impact construction techniques are used around
areas of vegetation to be retained to minimise interference
with the vegetation.
O11 Roads and stormwater drainage No solution provided O11 Complies
infrastructure is proven to be suitable for its
Appropriate tests will be performed to the
use prior to Council accepting the dedicated stormwater drainage before final
asset completion.
O12 Alignment of stormwater drainage S12.1 The location, design and construction of stormwater O12 Complies
infrastructure is to allow for easy access for drainage structures is in accordance with Sections 4 and 5
The proposed Stormwater Management
the ongoing maintenance by Council. of PSP5, Engineering Design Standards - Roads, Drainage Plan complies with sections 4 and 5 of the
and Earthworks; AND PSP5 Engineering Design Standards –
Roads, Drainage & Earthworks.
S12.2 Where infrastructure is located on private land an
easement is dedicated over the infrastructure in accordance
with Section 4 of PSP 5, Engineering Design Standards –
Roads, Drainage and Earthworks.
14.148 Frontage works
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.