Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Appendix E - Local Code Response

Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).

of 162

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS (if code assessable)                       ASSESSMENT

                                                  S10.5 Low impact construction techniques are used around

                                                  areas of vegetation to be retained to minimise interference

                                                  with the vegetation.

O11 Roads and stormwater drainage                 No solution provided                                          O11 Complies

infrastructure is proven to be suitable for its
                                                                                                                Appropriate tests will be performed to the
use prior to Council accepting the dedicated                                                                    stormwater drainage before final
asset                                                                                                           completion.

O12 Alignment of stormwater drainage              S12.1 The location, design and construction of stormwater     O12 Complies

infrastructure is to allow for easy access for    drainage structures is in accordance with Sections 4 and 5
                                                                                                                The proposed Stormwater Management
the ongoing maintenance by Council.               of PSP5, Engineering Design Standards - Roads, Drainage       Plan complies with sections 4 and 5 of the
                                                  and Earthworks; AND                                           PSP5 Engineering Design Standards –
                                                                                                                Roads, Drainage & Earthworks.

                                                  S12.2 Where infrastructure is located on private land an

                                                  easement is dedicated over the infrastructure in accordance

                                                  with Section 4 of PSP 5, Engineering Design Standards –

                                                  Roads, Drainage and Earthworks.

14.148 Frontage works
Log in to download the original file

Appendix E - Local Code Response.pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.