SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable) ASSESSMENT
O13 Development is provided with external S13.1 The following infrastructure components already exist S13.1 Complies
The development will comply where
roadworks along the full extent of the frontage at the frontage of the site or are provided at the developer’s
infrastructure is required.
of the site to an appropriate standard having expense—
regard to the specified function of the road. a) full width sealed road;
b) concrete kerb and channel where appropriate;
c) forming and grading to footpaths;
d) vehicular kerb and footpath crossings;
e) a constructed bikeway;
f) a constructed footpath;
g) a constructed carriageway;
h) required alterations to public utility mains, services
or installations;
i) construction of any required alterations to public
utility mains, services or installations;
j) stormwater drainage works; and
k) installation of electrical conduits; AND
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.