Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable) ASSESSMENT
S13.2 Road and drainage design and construction is in
accordance with Sections 3 and 4 of PSP5 Engineering
Design Standards – Roads, Drainage and Earthworks.
14.149 Road and rail corridors Not Applicable
14.150 Staged development Not Applicable
14.151 Alterations to services and utilities
O16 Any alterations or repairs to infrastructure S16.1 Any alterations or repair to infrastructure as a result S16.1 Complies
The development will comply where
as a result of the development are made at no of the development are completed at the developer’s
applicable.
cost to Council. expense.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.