Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
WATER SUPPLY AND SEWERAGE RETICULATION CODE
Table 14-62 Water Supply
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable) ASSESSMENT
14.164 Design and construction (water)
O1 Water supply infrastructure— S1.1 Water supply infrastructure is designed in accordance S1.1 Complies
The proposal complies with the best
a) meets the needs of the users; with PSP6 – Engineering Design Standards — Water and
practice techniques as recommended in the
Sewerage and As Constructed data submitted in
b) is designed to be compatible with PSP6 – Engineering Design Standards —
accordance with PSP6 – Engineering Design Standards —
existing infrastructure; and Water and Sewerage.
Water and Sewerage.
c) is designed using materials that are
suitable for the use, durable, easy to
maintain and cost effective, taking into
account the whole of life cycle cost
and Council’s maintenance inventory.
O2 Water supply infrastructure is S2.1 Water supply infrastructure is constructed in S2.1- S2.2 Complies
constructed— accordance with PSP6 – Engineering Design Standards —
The construction drawings will be designed
a) in accordance with appropriate Water and Sewerage; AND
in accordance with the PSP6 – Engineering
engineering standards; and Design Standards — Water and Sewerage
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.