Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Appendix E - Local Code Response

Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).

of 162

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS (if code assessable)                          ASSESSMENT

    b) to minimise adverse environmental           S2.2 Erosion and sediment control measures are designed          and     Erosion       and     sediment          control

        impacts                                    and implemented in accordance with the Institution of            measures       -     Institution    of   Engineers

                                                   Engineers Australia (Queensland Division) Soil Erosion and       Australia     (Queensland           Division)       Soil

                                                   Sediment Control - Guidelines for Queensland Construction        Erosion and Sediment Control - Guidelines

                                                   Sites.                                                           for Queensland Construction Sites.


O3 Water supply infrastructure is proven to be     No solution provided.                                            O3 Complies

suitable for its use prior to Council accepting
                                                                                                                    Appropriate tests will be performed to the
the dedicated asset.
                                                                                                                    water       supply      system       before         final

                                                                                                                    completion.


O4 Water supply infrastructure is provided         No solution provided.                                            O4 Complies

with all supporting technical documentation.
                                                                                                                    All the documentation regarding testing and

                                                                                                                    material quality certificates and standards

                                                                                                                    will be provided to Council for their records.


O5 Where buildings or other structures are in      S5.1 The footing of any building or structure is located clear   O5 Not Applicable

proximity to State or Council’s water supply       of the zone of influence but no closer than 1.5m (measured
                                                                                                                    The     proposed       structures     are     not     in
infrastructure, provision is made to protect the   horizontally) from infrastructure including sewers, water
                                                                                                                    proximity to State or Council’s water supply
Log in to download the original file

Appendix E - Local Code Response.pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.