Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable) ASSESSMENT
b) to minimise adverse environmental S2.2 Erosion and sediment control measures are designed and Erosion and sediment control
impacts and implemented in accordance with the Institution of measures - Institution of Engineers
Engineers Australia (Queensland Division) Soil Erosion and Australia (Queensland Division) Soil
Sediment Control - Guidelines for Queensland Construction Erosion and Sediment Control - Guidelines
Sites. for Queensland Construction Sites.
O3 Water supply infrastructure is proven to be No solution provided. O3 Complies
suitable for its use prior to Council accepting
Appropriate tests will be performed to the
the dedicated asset.
water supply system before final
completion.
O4 Water supply infrastructure is provided No solution provided. O4 Complies
with all supporting technical documentation.
All the documentation regarding testing and
material quality certificates and standards
will be provided to Council for their records.
O5 Where buildings or other structures are in S5.1 The footing of any building or structure is located clear O5 Not Applicable
proximity to State or Council’s water supply of the zone of influence but no closer than 1.5m (measured
The proposed structures are not in
infrastructure, provision is made to protect the horizontally) from infrastructure including sewers, water
proximity to State or Council’s water supply
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.