Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable) ASSESSMENT
infrastructure from physical damage and to mains and stormwater structures; AND infrastructure.
allow ongoing maintenance by Council. S5.2 A registered easement in favour of Council is created
over all underground infrastructure located in private
property; AND
S5.3 The width of the easement is the greater of 3m or the
width of the zone of influence; AND
S5.4 The easement is centred over the centreline of the
infrastructure.
O6 Alignment of water supply infrastructure S6.1 Infrastructure is designed and constructed on the S6.1 Complies
allows for easy access for the ongoing preferred alignments in accordance with PSP6 Engineering
Construction drawings will be designed in
maintenance by Council. Design Standards – Water and Sewerage.
accordance with the PSP6 – Engineering
Design Standards — Water and Sewerage
O7 Any alterations or repairs to infrastructure S7.1 Any alterations or repair to infrastructure as a result of S7.1 Complies
as a result of the development are made at no the development are completed at the developer’s expense.
The developer will accept the responsibility
cost to Council.
if external infrastructure is damaged as a
result of the construction of the
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.