Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable) ASSESSMENT
and implemented in accordance with the Institution of Erosion and Sediment Control - Guidelines
Engineers Australia (Queensland Division) Soil Erosion and for Queensland Construction Sites.
Sediment Control - Guidelines for Queensland Construction
Sites
O10 Sewerage reticulation infrastructure is No solution provided. O10 Appropriate tests will be performed to
proven to be suitable for its use prior to the sewer system before final completion.
Council accepting the dedicated asset.
O11 Sewerage reticulation infrastructure is No solution provided. O11 All the documentation regarding
provided with all supporting technical testing and material quality certificates and
documentation. standards will be provided to Council for
their records.
O12 Where buildings or other structures are S12.1 The footing of any structure or building is located O12 The proposed structures are not in
developed adjacent to Council’s sewerage clear of the zone of influence but no closer than 1.5m proximity to State or Council’s sewer
reticulation infrastructure, satisfactory (measured horizontally) from infrastructure including reticulation infrastructure.
provision is made to protect the infrastructure sewers, water mains and stormwater structures; AND
from physical damage and to allow ongoing S12.2 A registered easement in favour of Council is created
maintenance by Council. over all underground infrastructure located in private
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.