Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Appendix E - Local Code Response

Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).

of 162

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS (if code assessable)                       ASSESSMENT

                                                  and implemented in accordance with the Institution of         Erosion and Sediment Control - Guidelines

                                                  Engineers Australia (Queensland Division) Soil Erosion and    for Queensland Construction Sites.

                                                  Sediment Control - Guidelines for Queensland Construction

                                                  Sites

O10 Sewerage reticulation infrastructure is       No solution provided.                                         O10 Appropriate tests will be performed to

proven to be suitable for its use prior to                                                                      the sewer system before final completion.

Council accepting the dedicated asset.

O11 Sewerage reticulation infrastructure is       No solution provided.                                         O11       All the documentation regarding

provided with all supporting technical                                                                          testing and material quality certificates and

documentation.                                                                                                  standards will be provided to Council for

                                                                                                                their records.


O12 Where buildings or other structures are       S12.1 The footing of any structure or building is located     O12 The proposed structures are not in

developed adjacent to Council’s sewerage          clear of the zone of influence but no closer than 1.5m        proximity to State or Council’s sewer

reticulation infrastructure, satisfactory         (measured horizontally) from infrastructure including         reticulation infrastructure.

provision is made to protect the infrastructure   sewers, water mains and stormwater structures; AND

from physical damage and to allow ongoing         S12.2 A registered easement in favour of Council is created
maintenance by Council.                           over all underground infrastructure located in private
Log in to download the original file

Appendix E - Local Code Response.pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.