Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable) ASSESSMENT
property; AND
S12.3 The width of the easement is the greater of 3m or the
width of the zone of influence; AND
S12.4 The easement is centred over the centreline of the
infrastructure.
O13 Alignment of sewerage reticulation S13.1 Infrastructure is constructed on the preferred O13 The construction drawings will be
infrastructure is to allow for easy access for alignments in accordance with PSP6 –Engineering Design designed in accordance with the PSP6 –
the ongoing maintenance by Council. Standards — Water and Sewerage. Engineering Design Standards — Water
and Sewerage
O14 Any alterations or repairs to infrastructure S14.1 Any alterations or repair to infrastructure as a result O14 The developer accept the
as a result of the development are made at no of the development are completed at the developer’s responsibility if external infrastructure is
cost to Council expense. damaged as a result of the construction of
the development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.