Skip to the record
Accept no imitations.

Original source · versioned page text

2022-01-17 General Committee Meeting Agenda

of 72

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 52 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                             17 JANUARY 2022

        Noosa Shire Council
       2021/22 Budget Review 2 - Capital Submissions

       [Sunshine Beach Skate Park New Shade Structure 0      80.95T                                                          888
      [Replace Shade Shelters atNoosa Banks                                                                                   8B
      [Sunshine Beach Metal SkateRampRenewal                80.000, 8OOOC—C—CSSCSC‘“‘(‘SNCCC*dC
       Total Parks& Playgrounds                              OKT
      |Noosa Heads Noosa Parade Road ComdorUpgrage          BATT                                                            88
       [Coorey Maple Street Raised PedesinanCrossng ss S8S4OTSC~—sSSCS™SSSCSC“‘COCSC™C‘isA, OC™—™OTCOCOCSCSCSCSC*Sd
       [Wallace Park Pathway 586
       INoosavile Sea Eagle Drive & Shire Drve Pathway Upgrades «176.418 =—=SSS*~*~CS*~« TRS) SSS*~<“<~*‘“‘*S*S*S*SCSCS*C*~*C«        sR reallocated tothe reseal program. Project completed     |
       [Peregian Beach Boardwalk 00                                                     so)                                    5.321 Works complete with savings realised as actual costs under budget estimate _|
       [Sunshine Beach BelmoreTce PathwayRenewal            00.000                                              f20,000)            Construction delayedto 2022/23,
       (Cooray Maple St Pathway OverianderAv BruceHwy       10,000                                              ato 000)            construction delayedto 2022/23.     OOOO™~<“Cs*~*‘“‘s*~*~*~*~*~*~*

      [TewantinEmest_Goodchap StPath Linkage                                                                                  25,000 SEOESP 3-year grant project committed for delivery in 2021/22
       Peregian Beach Plover StPatwayPpertoJacrna                                       S888 8,000 SECS 3-year grant project committed fordelivery in 2021/22
      [fotal Pathways &Boardwalks                          TTT,                     280,074)      103,000       (290.500)   3.106.201                                             C—C“‘“‘CNC‘idCN
       Public Amenities RenewalProgram                                                            0,000                |(200,000|SEQCSP 3-year grant project committed for delivery in 2021/22,
      [fotalPublicamenities                                                                       200.0000
       [Shire Bus Sheer Disabled Compliant ProgramAnnual    362.901                                                        8B
       [Total Public Transportinfrastructure          SAB
     paanesmen                                            ae                       es                             |             ee
                                                                                                                                     Eagle Drive respetive’
       Tewantin Bypass Stage 1                                                       400.000                   {2,000,000}          Works underway. Some costs rescheduled to 2022/23 based on project timing,
                                                                                                                                    and associated pavement work on Cooroy Noosa Rd reallocated from the reseal
penom em                                                                                  ||                                                  tena nananememcm                                  |
      [TotalsealedRoadsNetwork                             ATES          86.231      176.418                  (2.000.000)  12739140                                                     C—C‘“‘CSCisCS
       Sports Ground and Facilities
                                                                                                                         Page 52 of 72
Log in to download the original file

2022-01-17 General Committee Meeting Agenda(PDF, 5MB).pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.