GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 53 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                                  17 JANUARY 2022

  Noosa Shire Council
  2021/22 Budget Review 2 - Capital Submissions

 Detaled Design Redevelopment Cooray Sports Complex        80.000
[otal SportsGroundandFaciiies                              0.000,
 JGympie Terrace Stommwster 8g
 Noosaville, Project Ave Stormwater Drainage Easement Upg                           282,098                                    498,404 Tendered cost to undertake works significantly higher than original budget
                                                                                                                                     estimate due to factors including site constraints and inflated market
  [Sunrise Beach Sobraon Steet ope Stbilsaton —SOOUETFsC“~*~s*s*sS™S*~*~“s*S*sS™*~étéOOSC ns                                                                              —SOCOC‘<S
 ee                                                                                                     |                               rung n 2/2 wh nso heed                       20223
                                                                                                                                      desig   c     in 2021/22, with construction scheduled in 2022/23
frotal stormwater Drainage                SSSCSC~SCSC~C‘ OSC
 Noosa Junction Sueetscape                                20.                       200,000 S_—«26,087 Progress stage 1A design works. Tobe funded through levy infiture years.                       |
  Total Streetscape Road Corridors                        26,047            o       100,000            0               o       126.047

  [Tewantin, Hilton Tce & Emest St intersection Upgrade —=ss—s=itiSsS*~<i*é‘sRSYSCOC*‘CS™#O#*‘C‘C*“‘«U9;9686 Projectcomplete. Minor savingsrealised =
  Transport Strategy, Walking & Cycling Strategy &CNLG Grant 42.05 8
  INoosa Heads, Noosa Drive Halse Lane to Sunshine SeachRd 270.00, COC™~—SSC“‘cRTOOOSCOC~—CSCSC“‘“C*CSC*“‘“‘S™S™S*™S™S™S™C™C™C™C~C™C~C~C~CCC~*YS
  Total Transport and Infrastructure Management         1,217,908           0         (888)            0               0     1.217.020
 INoosa Heads The
5	1	1	1	19	4	461	1575	88	65	58	Woods’
5	1	1	1	19	5	548	1575	44	65	58	Bin
5	1	1	1	19	6	591	1575	88	65	46	Storage
5	1	1	1	19	7	683	1575	126	65	46	Enclosure
5	1	1	1	19	8	819	1575	44	65	48	=
5	1	1	1	19	9	1035	1575	88	65	46	40078
5	1	1	1	19	10	1788	1575	99	65	26	26,000)
5	1	1	1	19	11	1924	1575	147	65	0	—=—«N5,076
5	1	1	1	19	12	2070	1575	71	65	0	Delay
5	1	1	1	19	13	2140	1575	28	65	0	of
5	1	1	1	19	14	2167	1575	34	65	77	of
5	1	1	1	19	15	2200	1575	82	65	7	project
5	1	1	1	19	16	2281	1575	142	65	7	construction
5	1	1	1	19	17	2427	1575	50	65	25	until
5	1	1	1	19	18	2487	1575	98	65	25	2022/23
4	1	1	1	20	0	249	1631	2735	30	-1	
5	1	1	1	20	1	245	1627	127	46	84	[Masterplan
5	1	1	1	20	2	371	1627	93	46	89	Landfill
5	1	1	1	20	3	471	1627	24	46	75	SW
5	1	1	1	20	4	501	1627	105	46	75	Controls
5	1	1	1	20	5	609	1627	16	46	0	&
5	1	1	1	20	6	628	1627	89	46	0	Design
5	1	1	1	20	7	1038	1627	47	46	43	8.
5	1	1	1	20	8	1981	1627	78	46	37	888
4	1	1	1	21	0	249	1665	2735	68	-1	
5	1	1	1	21	1	315	1661	197	94	24	eee
5	1	1	1	21	2	699	1661	142	94	31	eee
5	1	1	1	21	3	1788	1665	102	68	51	|
5	1	1	1	21	4	2148	1661	424	94	47	eee
4	1	1	1	22	0	2100	1708	363	25	-1	
5	1	1	1	22	1	2100	1716	69	17	36	pproac
5	1	1	1	22	2	2219	1708	28	17	69	Ening
5	1	1	1	22	3	2271	1704	32	32	96	to
5	1	1	1	22	4	2303	1704	46	32	96	site
5	1	1	1	22	5	2351	1704	75	32	95	master
5	1	1	1	22	6	2442	1715	21	7	67	plz
4	1	1	1	23	0	249	1736	2735	65	-1	
5	1	1	1	23	1	305	1732	138	91	20	ee
5	1	1	1	23	2	1905	1732	365	91	25	ee
4	1	1	1	24	0	2089	1781	91	18	-1	
5	1	1	1	24	1	2089	1781	91	18	41	2022/23_
4	1	1	1	25	0	242	1804	2690	34	-1	
5	1	1	1	25	1	242	1804	127	33	9	Noosaville
5	1	1	1	25	2	369	1804	96	33	94	Eumundi
5	1	1	1	25	3	470	1804	59	33	95	Road
5	1	1	1	25	4	531	1804	91	33	79	Landfill
5	1	1	1	25	5	622	1804	113	33	96	Expansion
5	1	1	1	25	6	734	1804	31	33	96	of
5	1	1	1	25	7	770	1804	105	33	95	Resource
5	1	1	1	25	8	1011	1804	106	34	92	268,727
5	1	1	1	25	9	2071	1807	89	33	96	Project
5	1	1	1	25	10	2159	1807	86	33	96	delayed
5	1	1	1	25	11	2244	1807	97	33	96	aligning
5	1	1	1	25	12	2341	1807	29	33	96	to
5	1	1	1	25	13	2374	1807	121	33	96	completion
5	1	1	1	25	14	2497	1807	26	33	96	of
5	1	1	1	25	15	2528	1807	50	33	97	site
5	1	1	1	25	16	2577	1807	131	33	94	masterplan.
5	1	1	1	25	17	2712	1807	78	33	96	Design
5	1	1	1	25	18	2789	1807	96	33	96	2022/23
5	1	1	1	25	19	2885	1807	48	33	96	and
4	1	1	1	26	0	244	1833	2072	44	-1	
5	1	1	1	26	1	244	1833	111	44	96	Recovery
5	1	1	1	26	2	2081	1848	136	19	95	construction
5	1	1	1	26	3	2223	1848	93	22	95	2023/24
4	1	1	1	27	0	250	1877	1821	39	-1	
5	1	1	1	27	1	250	1885	58	19	96	Total
5	1	1	1	27	2	313	1887	73	17	96	Waste
5	1	1	1	27	3	392	1887	150	25	96	Management
5	1	1	1	27	4	993	1877	120	36	90	2,559,506
5	1	1	1	27	5	1283	1887	15	17	39	o
5	1	1	1	27	6	1363	1877	118	39	92	2,672,653
5	1	1	1	27	7	1651	1887	15	17	32	0
5	1	1	1	27	8	1780	1878	105	38	94	(269,719)
5	1	1	1	27	9	1960	1887	111	25	91	4,962,440
4	1	1	1	28	0	245	1945	2746	39	-1	
5	1	1	1	28	1	1036	1923	97	77	0	eS
4	1	1	1	29	0	249	2125	2735	33	-1	
5	1	1	1	29	1	245	2106	66	66	76	[Shire
5	1	1	1	29	2	316	2106	61	66	87	CCTV
5	1	1	1	29	3	377	2106	110	66	79	Drainage
5	1	1	1	29	4	487	2106	99	66	67	Condition
5	1	1	1	29	5	597	2106	143	66	95	Assessment
5	1	1	1	29	6	740	2106	193	66	50	ProgramAnnual
5	1	1	1	29	7	1009	2106	111	66	0	20000
5	1	1	1	29	8	1785	2106	187	66	0	S—S—~—SS—i
5	1	1	1	29	9	2016	2106	50	66	0	OO
5	1	1	1	29	10	2610	2106	374	66	0	OOCOSSCSCS
4	1	1	1	30	0	249	2196	2735	32	-1	
5	1	1	1	30	1	234	2177	81	64	67	JAsset
5	1	1	1	30	2	314	2177	150	64	71	Management
5	1	1	1	30	3	463	2177	92	64	73	Systems
5	1	1	1	30	4	559	2177	182	64	40	implementaton
5	1	1	1	30	5	927	2177	17	64	16	|)
5	1	1	1	30	6	937	2196	2047	32	0	20000CSOSC~“—‘t
5	1	1	1	30	7	2021	2177	75	64	56	ONS
5	1	1	1	30	8	2463	2177	518	64	0	OCO—C—SOOCOCOC“(NNCNC#C*@d’
4	1	1	1	31	0	240	2232	1830	38	-1	
5	1	1	1	31	1	240	2234	72	36	96	Total
5	1	1	1	31	2	312	2234	66	36	96	Asset
5	1	1	1	31	3	384	2234	150	36	96	Management
5	1	1	1	31	4	1005	2232	107	34	94	1,200,000
5	1	1	1	31	5	1283	2236	14	20	83	0
5	1	1	1	31	6	1467	2236	14	20	77	0
5	1	1	1	31	7	1651	2236	14	20	79	0
5	1	1	1	31	8	1872	2236	14	20	84	0
5	1	1	1	31	9	1963	2236	107	22	85	1,200,000
4	1	1	1	32	0	1918	2289	289	44	-1	
5	1	1	1	32	1	1918	2289	105	44	96	Page
5	1	1	1	32	2	2039	2289	48	35	96	53
5	1	1	1	32	3	2103	2289	42	35	96	of
5	1	1	1	32	4	2159	2289	48	34	96	72
Log in to download the original file

2022-01-17 General Committee Meeting Agenda(PDF, 5MB).pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.