Original source · versioned page text
Template4Waterwaybarrierworks_RosesRoad
6) If the barrier is temporary (in place less than 12
months) how many days will the barrier be in
place?
7) Will the barrier extend across the waterway Yes, go to question 8
from bank to bank? No
7.1) What is the length of the proposed
metres
barrier? (across the waterway)
7.2) What is the width of the waterway? (bank to metres
bank)
8) What is the purpose of the proposed
barrier? (e.g. creating a new or increasing the capacity
of the existing water storage, maintenance work)
9) What are the details of the proposed
construction materials? (e.g. earth, concrete, rock
fill, steel, timber, sand)
10) Provide the following details of the Total crest height (D) metres
proposed barrier in reference to the diagrams Thickness (A) of crest metres
below.
Height of spillway/bywash (H) metres
Width of spillway/bywash inlet (W) metres
Base width (B) metres
Internal diameter (O) of outlet millimetres
pipe/works and discharge capacity
Length of wall (L) metres
Distance of backup from barrier metres
wall at full supply level
Volume of storage megalitres
If raising an existing waterway metres
barrier, additional height above
existing crest
If raising an existing waterway
barrier, method of raising (e.g.
capping crest, inflatable bag, gates
etc.).
DA Form 1 – Template 4 Waterway barrier works
Version 1.1— 22 JUNE 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original