Template4Waterwaybarrierworks_RosesRoad
Part 3 – CONSTRUCTING A NEW OR MODIFYING (INCLUDING MAINTENANCE AND
REPLACEMENT OF) AN EXISTING CULVERT
Note: If the development application involves more than one culvert relating to this part, please generate another part 3 and attach to the application.
Construction of a new culvert
11) What is the nature of the proposed
Maintenance of an existing culvert
work?
Replacement of an existing culvert
12) What is the purpose of the proposed Crossing of Skyring Creek for a new driveway access to Lot 2
culvert? RP95476
13) If the culvert is temporary (in place less N/A
than 12 months) how many days will the
culvert be in place?
14) Will the culvert extend across the Yes, go to question 15
waterway from bank to bank? No
14.1) What is the length of the proposed
metres
culvert? (across the waterway)
14.2) What is the width of the waterway? metres
(bank to bank)
Box culvert Arch culvert Pipe culvert
15) What type of culvert is proposed?
(Tick all applicable boxes) Combination culvert Other – please Link slab between
specify 2 RCBC’s
How many culvert cells are there? 3
What is the upstream downstream culvert cell
3.66 metres
length?
What is the inside cell width of each culvert (or
16) In reference to the diagrams below, 1.9 metres
diameter of pipe culvert)?
provide the following details of the
What is the internal height within the culvert cell? Outer
proposed culvert.
cells =
0.9
metres
Link
Slab =
1.4
DA Form 1 – Template 4 Waterway barrier works
Version 1.1— 22 JUNE 2018