Original source · versioned page text
Template4Waterwaybarrierworks_RosesRoad
21) What is the purpose of the proposed
barrier?
22) What is the maximum height of the
proposed barrier above the existing bed metres
level?
23) What are the proposed construction
materials? (e.g. earth, concrete, rock fill, timber,
sand)
24) Does the barrier follow the natural Yes
gradient of the bed level? No
DA Form 1 – Template 4 Waterway barrier works
Version 1.1— 22 JUNE 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original