Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

planning report Other Change

of 89

Page text read automatically using OCR, there may be inaccuracies

Earthworks and Drainage

Performance Outcome                         Acceptable Outcome                     Compliance
PO54                                        AO54                                   N/A
Filling, excavation and retaining           Filling and excavation works are
structures do not directly, indirectly or   designed and constructed to ensure
cumulatively cause adverse impacts          overland flow and/or flooding is not
external to the development site by:        worsened, impeded, or otherwise
(a) causing ponding of water on the         diverted to adversely affect other
      site or nearby land;                  properties or downstream
(b) causing erosion or the transport        environments.
      of sediment off the site;
(c) increasing flooding, which
      adversely affects the safety or
      use of any land upstream and
      downstream; or adversely
      affecting the flow of water in any
      overland flow path.




                                                                                                Page 37 of 89

Log in to download the original (planning report Other Change.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.