planning report Other Change
Earthworks Code
Effects of works
Performance Outcome Acceptable Outcome Compliance
Drainage AO1
PO1 Filled or excavated areas have a
Finished surface levels ensure land minimum gradient of 0.5% and drain
is free draining. to Council’s stormwater infrastructure
where available, or where stormwater
infrastructure is not available, toward
the street.
Hydraulics No acceptable outcome provided
PO2
Change to the levels on site do not
have an adverse impact on the
flooding and drainage characteristics
off-site.
Geotechnical considerations AO3.1
PO3 Filling works are undertaken in
Earthworks do not result in accordance with Council’s Planning
geotechnical instability on-site or to Scheme Policy PSP6 Engineering
nearby premises design standards - roads, drainage
and earthworks.
AO3.2
Where the filling is for residential,
commercial or industrial purposes the
works comply with Australian
Standard - Guidelines for earthworks
on commercial & residential
development.
Local amenity AO4.1
PO4 The following control measures are
Undertaking earthworks does not implemented—
adversely impact on the amenity of
the local area by way of dust, noise (a) regular water spraying of
or visual amenity. exposed areas to suppress dust;
(b) provision of dust stabilised or
sealed internal roads;
(c) protective covering of exposed
areas that are left for more than
2 weeks; and
(d) unless a development permit
provides otherwise, disturbed
areas are revegetated using
species identified in Council's
Planning Scheme Policy PSP2
Landscaping.
AO4.2
Earthworks are undertaken only
during the hours of 7:00am to
6:00pm, Monday to Friday and
7:00am to 3:00pm on Saturday. No
work is undertaken on Sunday or
public holidays.
Vegetative waste AO5.1
PO5 Cleared vegetation is transported off-
Vegetation cleared from a site for disposal in an approved
development site is disposed of in an green waste disposal facility.
environmentally responsible manner.
AO5.2
Cleared vegetation is mulched on-
site and reused for landscaping of
the finished development.
AO5.3
Cleared vegetation is disposed of for
the purpose of firewood.
Page 50 of 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (planning report Other Change.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.