                                         AO5.4
                                         Disposal of vegetative waste by
                                         burning off is avoided.
Haulage activity and amenity             No acceptable outcome provided
PO7
Haulage of material to and from a
site ensures—

(a) minimal disturbance to
    neighbouring properties and
    properties along the haulage
    route; and
(b) Council’s road infrastructure
    including pavements is not
    adversely affected.

Extent of earthworks                     AO8
PO8                                      All earthworks, including cut and fill
The layout of the development            batters, retaining walls and the like
provides adequate, clearly defined       are contained within the subject site
and easily accessible—

(a) on-site vehicle parking and
    manoeuvring areas; and
(b) loading and manoeuvring areas
    for delivery and service vehicles.

Infrastructure protection                No acceptable outcome provided
PO10
Earthworks and vehicular access do
not adversely impact on the capacity,
operations and maintenance of
existing infrastructure.
Environmental protection                 No acceptable outcome provided
PO11
Earthworks minimise any adverse
impact upon groundwater,
watercourses, drainage lines,
wetlands, and native vegetation.
Dams                                     AO12.1                                     N/A
PO12                                     Where the site is in the Rural zone—
Dam location and construction
does not impact upon                     (a) the land has a slope of less than
neighbouring properties or road              25% (1:4);
reserves, in terms of—                   (b) the earthworks including cut and
                                             fill batters and retaining walls are
(a) hydrology;                               setback a minimum of 50 metres
(b) alteration of existing overland          from the property boundary; and
    flow paths and patterns;             (c) the size of the lot is greater than
(c) landslide or failure of dam wall;        5 hectares.
    and
(d) effluent disposal areas.             AO12.2
                                         Where the site is in the Rural
                                         residential zone or the Rural zone
                                         and the lot is less than 5 hectares:

                                         (a) the land has a slope of less than
                                             1:6;
                                         (b) the earthworks including cut and
                                             fill batters and retaining walls are
                                             setback a minimum of 20 metres
                                             from the property boundary; and
                                         (c) the dam work involves less than
                                             500m³ of material.

                                         AO12.3
                                         For all other zones—
                                         No acceptable outcome provided

                                                                                          Page 51 of 89

Log in to download the original (planning report Other Change.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.