Original source · versioned page text
planning report Other Change
Existing Services Code
Setbacks, easements and maintenance
Performance Outcome Acceptable Outcome Compliance
PO1 No acceptable outcome provided
Development near a stormwater
drain, overland flow path or
associated structure does not—
(a) adversely affect the function of
the service;
(b) place an additional load on the
service; and
(c) unduly increase future
maintenance costs.
PO2 AO2.1
Maintenance access is provided to For trunk infrastructure, a registered
all stormwater drains, overland flow easement in favour of Council is
paths and associated structures. created over all underground
infrastructure located in private
property.
AO2.2
The width of the easement required
is in accordance with Council’s
Planning Scheme Policy PSP6
Engineering Design Standards –
Roads, drainage and earthworks.
AO2.3
The easement is centred over the
centreline of the infrastructure.
Page 52 of 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (planning report Other Change.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.