planning report Other Change
(b) protect and maintain wildlife Low impact construction techniques
corridor movements and the are used around areas of vegetation
safety of native fauna; to be retained to minimise
interference with the vegetation.
(c) provide for compensatory habitat
establishment and maintenance;
AO12.3
(d) minimise changes to the Roads avoid native vegetation and
hydrological regime, including provide appropriate fauna movement
drainage patterns, run-off and
corridors and protection measures.
water quality;
(e) avoid crossing watercourses, Editor’s Note— Measures may
drainage lines and wetlands, but
include fauna underpasses, ropes,
where such crossings are
fencing and the like.
unavoidable, disturbed areas are
reinstated and revegetated on
completion of works; and AO12.4
Road infrastructure within or adjacent
(f) minimise bulk earthworks. to native habitat incorporates fences
which allow for protected wildlife
movement and controls unrestricted
access of domestic cats and dogs.
AO12.5
Native vegetation is protected from
clearing or construction activities
by—
(a) clearly marking vegetation to be
retained with flagging tape;
(b) installing protective fencing
around the dripline of vegetation;
and
(c) ensuring stock piling, storage
and vehicle parking occur
outside the areas of vegetation
to be retained.
AO12.6
Where clearance of habitat is
unavoidable, once the area disturbed
by the works is re-established,
replacement habitat is planted in
proximity of the works to create
native fauna habitat suitable for the
area and maintained for the life of the
works.
PO13 AO13
Road infrastructure is constructed to Road infrastructure is constructed in
minimise adverse environmental accordance with Council’s Planning
impacts, including from run-off and Scheme Policy PSP6 Engineering
erosion Design Standards – Roads, drainage
and earthworks
External Works and Infrastructure
Performance Outcome Acceptable Outcome Compliance
PO14 AO14
Development is provided with Where not already existing, the
external works— following infrastructure
components are provided at the
(a) along the full extent of the frontage of the site—
frontage of the site to an
appropriate standard having (a) full width sealed road;
regard to the specified function (b) concrete kerb and channel
of the road; and where appropriate;
(b) provided beyond the site’s (c) forming and grading to
frontage if required. footpaths;
Page 68 of 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.