Original source · versioned page text
planning report Other Change
(d) vehicular kerb and footpath
crossings;
(e) a constructed bikeway;
(f) a constructed footpath;
(g) a constructed carriageway;
(h) required alterations to public
utility mains, services or
installations;
(i) construction of any required
alterations to public utility mains,
services or installations;
(j) stormwater drainage works; and
(k) installation of electrical conduits.
PO15 No acceptable outcome provided
Any alterations or repairs to
infrastructure as a result of the
development are made at no cost to
Council.
PO16 No acceptable outcome provided
Road infrastructure is proven to be
suitable for its use prior to Council
accepting the dedicated asset.
PO17 No acceptable outcome provided
Staged development is planned,
designed and constructed to ensure
that—
(a) each stage of the development
can be constructed without
interruption to services and
utilities provided to the previous
stages;
(b) the infrastructure provided is
capable of servicing the entire
development; and
(c) the materials used are
consistent throughout the
development.
Page 69 of 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.