                                         Editor's Note— PSP6 Engineering
                                         Design Standards - Roads, drainage
                                         and earthworks provides guidance on
                                         prepare a groundwater recharge and
                                         discharge plan.
Construction and establishment of        AO14.1
stormwater management systems            An erosion and sediment control plan
PO14                                     prepared in accordance with the
Construction methods provide for         International Erosion Control
appropriate controls to avoid entry      Association Best Practice Books
and transport of litter, sediment, and   demonstrates that the capture and
associated prescribed water              release of stormwater achieves the
contaminants into receiving waters.      design objectives listed in Table A:
                                         Construction phase – stormwater
Editor's note— Water contaminants        management design objectives of the
are prescribed in the Environmental      State Planning Policy (Appendix 2).
Protection Act 1994.



                                         Editor’s note— PSP6 Engineering
                                         Design Standards - Roads, drainage
                                         and earthworks provides guidance on
                                         requirements for preparing an
                                         Erosion Management Plan.




                                         AO14.2
                                          Construction works are designed
                                         and managed to restrict the extent of
                                         clearing and soil exposure to the
                                         minimum necessary for access, and
                                         safe construction at any one time.




                                         AO14.3
                                         For buildings:

                                         (a) upstream runoff is diverted
                                             around the construction site;
                                         (b) sediment barriers are provided
                                             downslope of disturbed areas to
                                             prevent sediment washing into
                                             gutters, drains and waterways ,
                                             wetlands or drainage lines either
                                             on or off the site; and
                                         (c) temporary or permanent
                                             downpipes are connected to the
                                             stormwater system before laying
                                             the roof; or
                                         (d) localised erosion is avoided by
                                             directing flow from downpipes
                                             over non-erosive areas.


                                         AO14.4
                                         Chemical flocculants used as part of
                                         an erosion and sediment control plan
                                         do not harm the environmental
                                         values within receiving waters.




                                         AO14.5
                                                                                 Page 75 of 89
Log in to download the original file

planning report Other Change.pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.