Original source · versioned page text
planning report Other Change
Appropriately sized litter
containment areas, with provision for
sorting recyclables are provided for
the type of litter expected to be
generated onsite.
PO15 AO15
Development does not discharge Wastewater (non-sewage) generated
wastewater unless it can be from the development is collected
demonstrated to not compromise and contained on-site, and is:
environmental values of waters and (a) lawfully disposed to sewer; or
water quality objectives.
(b) transferred off-site for
treatment/disposal to an
Editor’s Note—Environmental appropriately licenced facility;
values of waters and water quality
objectives are prescribed in Schedule (c) reused on-site in a closed-cycle
1 of the Environmental Protection irrigation scheme, industrial
processes, washing or cleaning
(Water) Policy 2009.
or other purpose; or
(d) treated to meet the drinking
water supply environmental
values prior to release.
Editor’s Note—The Plumbing and
Drainage Act 2003 sets out
requirements for wastewater
management.
PO16 AO16
On-site effluent treatment and
disposal systems are designed, An onsite effluent system and
constructed and managed to not disposal area is:
compromise the environmental
values of waters and water quality (a) not located on a slope greater
objectives. than 1 in (10%);
(b) not located at or below the 1%
annual exceedance probability
(AEP flood event);
(c) not located within a riparian
buffer area mapped on a
Biodiversity, Waterways and
Wetlands Overlay Map; and
(d) setback 400 metres minimum
from the full supply level of Lake
Macdonald.
Editor’s Note—The Plumbing and
Drainage Act 2003 sets out
requirements for on-site effluent
treatment and disposal. The
Queensland Plumbing and
Wastewater Code and associated
guidelines are used to confirm the
suitability of each site to
accommodate an on-site sewerage
facility; or where a centrally located
group collection treatment system is
proposed, confirmation as to the
suitability of the designated site to
accommodate the on-site sewerage
facility. Additionally, where the
combined total peak design capacity
of effluent treatment is less than 21
equivalent persons, the design of the
system achieves a low to medium
risk classification in accordance with
Seqwater’s Land Use Risk Tool for
onsite sewerage facilities.
Page 76 of 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.