Skip to the record
Beware of cheap imitations.

Original source · versioned page text

planning report Other Change

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Waterways Works Code

Performance Outcome                      Acceptable Outcome               Compliance
Role and function                        No acceptable outcome provided
PO1
A landing—
(a) provides a high level of amenity
     with no adverse effects on the
     surrounding area including
     changes to light, views, air
     quality and noise;
(b) is compatible with the scenic
     values of the waterway; and
(c) does not adversely affect the
     natural landscape character and
     vegetation along the foreshore.
Landings in conjunction with a           No acceptable outcome provided
commercial use
PO2
Development—
(a) does not detract from the
     function and viability of centres
     or nearby businesses;
(b) does not increase the overall
     scale and intensity of any
     commercial operation;
(c) does not provide additional
     commercial leases on the Noosa
     River;
(d) ensures no net increase in site
     cover or gross floor area of
     buildings or structures;
(e) uses materials, natural finishes
     and colours that blend with the
     surrounding natural landscape;
     and
(f) reflects the character and setting
     of the locality (such as timber
     and tin construction with a
     traditional pitched roof design).
PO3                                      No acceptable outcome provided
All commercial activities including,
the loading and unloading of
passengers and boat docking is
confined to the commercial lease
areas of the respective commercial
operation.

Editor’s Note— The commercial
lease area is the lease area at the
time of gazettal of this plan.
Car parking                              No acceptable outcome provided
PO4
Sufficient car parking is provided on
site to accommodate the number and
type of vehicles likely to be
generated by the use.
PO5                                      No acceptable outcome provided
The construction of new jetties,
wharves and boardwalks on freehold
land in largely undeveloped sections
of a watercourse is avoided.
PO6                                      No acceptable outcome provided
The construction of new jetties and
wharves on public lands is avoided
unless there is a clear demonstrated
community benefit and community
support.

                                                                                       Page 77 of 89
Log in to download the original file

planning report Other Change.pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.