                                                                               Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                 August 2021




                                        Noosa Residential
                                        Development
                                        17-19 Hofmann Drive,
                                        Noosaville QLD 4566

                                        Site Based Stormwater
                                        Management Plan

                                        Stockwell Development Groupe


                                        August 2021




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                          Page 1
Full text of pages 2 to 65 (of 86)

Page 2

                                                                                     Noosa Residential Development
                                                                               Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                        August 2021

Document Verification

Job Title            Noosa Residential Development

Job Number           24553

Document Title       Site Based Stormwater Management Plan

Document Control

     Date                            Document                Revision No.          Author           Reviewer

  25.06.2021      Site Based Stormwater Management Plan            00          P Pascon Da Paz       M Brown

  30.06.2021      Site Based Stormwater Management Plan            01          P Pascon Da Paz       M Brown

  28.07.2021      Site Based Stormwater Management Plan            02          P Pascon Da Paz       M Brown

  10.08.2021        Earthworks plan added to appendices            03              D Macky          M Van Italie


Approval for Issue

                    Name                                         Signature                             Date


                 Dane Macky                                                                         10.08.2021




               Michael Van Itallie                                                                  10.08.2021



© Document copyright of ADG Engineers (Aust) Pty Ltd

This document is and shall remain in the property of ADG. The document may only be used for the purpose
for which it was commissioned and in accordance with the Terms of Engagement for the commission.
Unauthorised use of this document in any form whatsoever is prohibited.

To the extent permitted by law, ADG expressly disclaims and excludes liability for any loss, damage, cost or
expenses suffered by any third party relating to or resulting from the use of, or reliance on, any information
contained in this report. ADG does not admit that any action, liability or claim exist or be available to any third
party.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                                  Page 2

Page 3

                                                                               Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                 August 2021


Contents
EXECUTIVE SUMMARY                                                                                          5
1     INTRODUCTION                                                                                         6
      1.1   Background                                                                                     6
      1.2   Background Information                                                                         6
      1.3   Property Detail                                                                                6
2     EXISTING SITE                                                                                        8
      2.1   Existing Site Features                                                                         8
3     FLOODING                                                                                             9
      3.1   Flooding Considerations                                                                        9
4     PROPOSED DEVELOPMENT                                                                                10
5     STORMWATER INFRASTRUCTURE                                                                           11
      5.1   Existing Infrastructure                                                                       11
      5.2   Lawful Point of Discharge (LPD)                                                               11
            5.2.1    Existing LPD                                                                         11
      5.3   External Catchment                                                                            11
6     STORMWATER QUANTITY ASSESSMENT                                                                      12
      6.1   Proposed Development and Associated Issues                                                    12
      6.2   Stormwater Quantity Modelling – XP-STORM                                                      12
      6.3   XP- Modelling Assumptions and Methodology                                                     12
            6.3.1    Pre-Development Case Model                                                           13
            6.3.2    Post-Development Case Model                                                          13
      6.4   Peak Storm Results                                                                            14
      6.5   Recommendation                                                                                14
      6.6   Onsite Detention Lifecycle Costs                                                              14
7     STORMWATER QUALITY ASSESSMENT                                                                       15
      7.1   Treatment Objectives                                                                          15
      7.2   Site Analysis and Design Strategy                                                             16
            7.2.1    Pre-Development Phase                                                                16
            7.2.2    Bulk Earthworks Phase                                                                16
            7.2.3    Construction Phase                                                                   17
            7.2.4    Maintenance                                                                          17
      7.3   Stormwater Quality Improvement Devices (SQIDs)                                                17
      7.4   Operational Phase Treatment                                                                   17
            7.4.1    Bioretention Basin                                                                   18
            7.4.2    Swale drains                                                                         18
      7.5   MUSIC Model                                                                                   18
      7.6   On-site Treatment Lifecycle Costs                                                             19
      7.7   Water Quality Monitoring                                                                      19
      7.8   Maintenance                                                                                   19
8     CONCLUSION                                                                                          20


BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                          Page 3

Page 4

                                                                                Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                  August 2021


Figures
Figure 1 - Site Location (as accessed from Noosa Interactive Maps 22.06.2021)                              7
Figure 2 - Site Layout (as accessed from Nearmaps 22.06.21)                                                8
Figure 3 – Development Flooding Data (1% AEP Flood Extent 2017)                                            9
Figure 4 - Treatment train Layout and Results                                                             19

Tables
Table 1 - Property Detail                                                                                  6
Table 2 – Proposed Development Areas                                                                      10
Table 3 – Detention Outlet Configuration                                                                  13
Table 4 – XP-STORM Modelling Peak Storm Mitigation Results (Free Outlet)                                  14
Table 5 – XP-STORM Modelling Peak Storm Mitigation Results (Full Open Channel at LPD)                     14
Table 6 - South East Queensland (SEQ) Targets                                                             15



Appendices
Appendix A Site Survey
Appendix B Architectural Drawings
Appendix C Preliminary Civil Plans
Appendix D NSC Code Responses
Appendix E NSC Erosion Hazard Assessment
Appendix F Noosa Shire Council Maps (Interactive Mapping)
Appendix G XP-Storm Modelling Results
Appendix H Approved Subdivision Plans Prepared by Barlow Shelly
Appendix I eMUSIC Modelling Information




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                          Page 4

Page 5

                                                                                  Noosa Residential Development
                                                                           Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                    August 2021


         EXECUTIVE SUMMARY
         ADG Engineers (Aust.) Pty Ltd has been engaged by Stockwell Development Group, to prepare a
         Site Based Stormwater Management Plan suitable for submission to Noosa Shire Council as
         additional information in support of a Development Application for a Material Change of Use at Lot 3
         on SP246584, 17-19 Hofmann Drive, Noosaville QLD 4566.

         The proposed development as shown in Mode Design architectural plans is for three (3) multi-storey
         residential buildings over a shared basement. The building work for the proposed development is to
         form part of separate application submitted to Council for building approval.

         This report is comprised of stormwater quantity and quality assessments. The quantity assessment
         is undertaken to confirm a ‘non-worsening’ of peak flow discharges from the site and the quality
         assessment is undertaken to determine the required stormwater treatment measures to be
         implemented on site.

         The stormwater quantity objective was to demonstrate that there are no impacts from storm events
         up to and including the 1% AEP storm event, which will ensure that the existing infrastructure and/or
         downstream properties are not adversely affected. It has been determined through the use of
         hydraulic modelling that 14.0m3 of On-Site Detention that occurs over the proposed bioretention
         basins is adequate to mitigate the impact of the proposed development and ensure post-
         development peak flows do not exceed pre-development peak flows.

         Currently no quality stormwater management measures are in place for the proposed Noosa
         Residential Development. Stormwater treatment measures are to be implemented on site in
         accordance with Industry Best Practice, WSUD Engineering Guidelines and the Noosa Plan 2020 to
         provide stormwater treatment for this site. The table below provides a summary of the stormwater
         management measures required for the proposed development

           Catchment     Quantity Mitigation Requirement             Quality Mitigation Requirement


               B1         9.7m3 of storage over bioretention                 80m2 Bioretention


               B2         4.3m3 of storage over bioretention                45m2 of Bioretention

                                                                Grass-lined swales that promote settlement
               B3                         Nil
                                                                              of particulates.


         All relevant standards and guidelines are addressed in this Stormwater Management Plan including
         criteria from the Noosa Shire Council Planning Scheme Policies, Queensland Urban Drainage
         Manual 2016, State Planning Policy 2017 Plumbing and Drainage Code AS3500.3 and Australian
         Rainfall and Runoff Guideline.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                             Page 5

Page 6

                                                                                  Noosa Residential Development
                                                                           Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                    August 2021


1        INTRODUCTION
1.1      Background
         ADG Engineers (Aust.) Pty Ltd was engaged by Stockwell Development Group, to carry out a Site
         Based Stormwater Management Plan (SBSMP) suitable for submission to Noosa Shire Council
         (NSC) and any required referral agencies for a proposed Noosa Residential Development at Lot 3
         on SP246584, 17-19 Hofmann Drive, Noosaville QLD 4566.

         The purpose of this report is to provide advice on the proposed development with regard to
         stormwater drainage, stormwater quality and quantity measures, and flooding. The required
         infrastructure will be subject to the conditions attached to the Development Approval to be provided
         by NSC and any nominated referral agencies.

1.2      Background Information
         This report was compiled using information from the following sources:

            NSC infrastructure mapping (Refer to Appendix F);
            NSC flood mapping (Refer to Appendix F);
            Detailed survey plan prepared by RPS Australia East Pty Ltd (Refer to Appendix A);
            Architectural drawings by Mode Design Corp. Pty Ltd (Refer to Appendix B); and
            Google Maps Aerial Imagery.

1.3      Property Detail
         The details of the property for the proposed development can be seen in Table 1 below.

                                  Table 1- Property Detail

          Existing Title             Lot 3 on SP246584


          Street Address             17 - 19 Hofmann Drive, Noosaville QLD 4566


          Existing Lot Area          317,290 m2


          Developable Site Area      10,113 m2




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                             Page 6

Page 7

                                                                                 Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                   August 2021

         The location of the proposed development is demonstrated in Figure 1.




                                                                                                        N
                                                                            Lot 3 on
                                                                           SP246584




                                                     Development Site




         Figure 1 - Site Location (as accessed from Noosa Interactive Maps 22.06.2021)




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                           Page 7

Page 8

                                                                                   Noosa Residential Development
                                                                             Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                      August 2021


2        EXISTING SITE
2.1      Existing Site Features
         The subject site is currently occupied by Noosa Civic shopping centre.

            The development is bound by:

             Hofmann Drive to the south;

             Noosa Civic Snooping Centre to the north; and

             Undeveloped land to the east and west following the RAL application approved by P & E
              Court Order No. 765 of 2020.

         The subject site is completely pervious and generally slopes from the north to the south at a grade
         of approximately 1.5%. Existing earthworks batters are located to the on the north and south
         boundaries, creating a low on the site and resulting in stormwater leaving the site via overland flow
         across the east boundary. The existing site features can be seen in Figure 2.




                                                                                                       N


                                                                                Noosa Civic
                                                                                 Shopping
                                                                                  Centre




                                                                                    Development
                                                                                        Site




                         Figure 2 - Site Layout (as accessed from Nearmaps 22.06.21)

         The existing contours, surface levels and the location of the existing infrastructure are identified on
         the survey plan attached in Appendix A of this report.



BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                               Page 8

Page 9

                                                                               Noosa Residential Development
                                                                         Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                  August 2021


3        FLOODING
3.1      Flooding Considerations
         Review of Councils interactive flood hazard overlay mapping has identified the development area is
         located outside the flood and inundation area with no waterways identified on the subject site, as
         shown in Figure 3 below.




                                                                                                        N




               Mapped waterway
             downstream of the site




                                                                                  Development Site




                 Figure 3 – Development Flooding Data (1% AEP Flood Extent 2017)




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                           Page 9

Page 10

                                                                                 Noosa Residential Development
                                                                           Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                    August 2021


4        PROPOSED DEVELOPMENT
         The proposed development as described in the architectural drawings in Appendix B is a residential
         development comprised of three (3) multi-storey residential buildings.

         A breakdown of the surface areas exposed to rainfall for the proposed development is presented in
         Table 2.

                                  Table 2 – Proposed Development Areas

           Catchment ID       Land Type      % Impervious      Area (m2)    Percentage of Total Site Area

                                 Roof              100           1,677                   16.59%
                B1
          (Catchment to      Landscaping            0            2,654                   26.25%
               rear           Hardstand            100            722                     7.14%
           Bioretention)
                                 Pool              100            53                      0.52%

                                 Roof              100           2,079                   20.57%
                B2
          (Catchment to      Landscaping            0            1,158                   11.46%
               front          Hardstand            100            356                     3.52%
           Bioretention)
                              Driveway             100            615                     6.08%

                B3          Landscaping             0             679                    6.71%
          (Catchment to
              bypass
           Bioretention)      Hardstand            100            116                    1.15%

              TOTAL                                56           10,113                  100.00%

         Refer to the Stormwater Quality Plan SK02 in Appendix C for further information regarding the areas
         calculated for each land type.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                            Page 10

Page 11

                                                                                  Noosa Residential Development
                                                                            Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                     August 2021


5        STORMWATER INFRASTRUCTURE
5.1      Existing Infrastructure
         A DBYD search and detailed survey has identified the following stormwater infrastructure within the
         vicinity of the subject site:

            Existing Concrete Box Culverts, 4 x (600mm x 1200mm) traversing under 17-19 Hofmann Drive,
            Noosaville (Lot 3 on SP126203) to the southeast of the proposed development located within the
            stormwater covenant south of proposed LPD;
            Existing Council stormwater infrastructure consisting of 375mm stormwater pipes and gully pits
            external to 17-19 Hofmann Drive, Noosaville (Lot 3 on SP126203) traversing Hofmann Drive
            southeast of the proposed development; and
            Existing Council stormwater infrastructure consisting of DN300 stormwater pipes and gully pits
            external to 17-19 Hofmann Drive (Lot 3 on SP126203) near the north-eastern roundabout.

         Refer to Appendix A for the detailed survey for further information regarding the existing stormwater
         infrastructure.

         Note: Existing optical fibre cables are shown on the survey within the development area and are to
         be considered during detail design and construction stages.

5.2      Lawful Point of Discharge (LPD)
5.2.1    Existing LPD
         Based on information gathered via survey and contour data, aerial imagery and previous
         Development Approval investigation, it has been determined that the subject site discharges
         stormwater flows via overland flow to the stormwater covenant (Covenant J) as identified in the
         survey plan (refer to Appendix A) along the eastern boundary of the site, which feeds the culverts
         under Hofmann Drive as discussed above.

5.2.2    Proposed LPD
         The proposed primary LPD for the development is the same stormwater covenant as the pre-
         development case, which is consistent with the RAL application approved by P & E Court Order No.
         765 of 2020. As a part of the proposed subdivision works across the site (refer to Appendix H for
         associated civil plans) a stormwater connection is to be provided to each of the three (3) proposed
         lots that make up the development site. These connection points drain to the drainage covenant
         discussed previously. It is anticipated that as a part of the proposed building works these three lots
         will be amalgamated, and these existing connection points will be removed and replaced with outlets
         to suit the proposed development. These outlets primarily discharge directly to the open channel to
         the east of the site, though a portion of Catchment B3 will discharge to the kerb and channel in
         Hofmann Drive, which in turn discharges via existing gully pits to the same point as the drainage
         covenant on the far side of Hofmann Drive.

         Refer to Appendix C for the Preliminary Layout Plans prepared by this office.

5.3      External Catchment
         The proposed balance lot to the west of the site presently drains through the development area,
         along with a portion of the adjacent shopping centre service driveway. The approved subdivision
         plans prepared by Barlow Shelly (refer to Appendix H), indicates that the works associated with the
         proposed RAL (P & E Court Order No. 765 of 2020) will divert these flows away from the development
         area.



BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                             Page 11

Page 12

                                                                                  Noosa Residential Development
                                                                            Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                     August 2021


6        STORMWATER QUANTITY ASSESSMENT
         The aim of the stormwater quantity assessment is to ensure that the development shall impose no
         adverse effects on downstream properties or receiving water bodies and that the conveyance of
         flows will be in a safe manner with minimal risk of human endangerment as well as the following
         objectives:

            Address the need for stormwater quantity control measures;
            Ensure there is no actional impacts from the subject site for events up to and including the 1%
            AEP event; and
            Ensure proposed quantity control measures detain and convey flows in accordance with QUDM
            (2017) minimum freeboard recommendations.

6.1      Proposed Development and Associated Issues
         As noted in Section 2.1 the existing site has no impervious areas and as noted in Table 2 the
         proposed development is 56% impervious. One of the major implications of an increase in impervious
         area is that the total volume and flow rate of stormwater run-off from the catchment will generally
         increase.
         It is essential that any increases are mitigated such that post-developed peak flows and volumes do
         not exceed those for the pre-developed case.

6.2      Stormwater Quantity Modelling – XP-STORM
         An XP-STORM Hydraulic and Runoff model was created to analyse the pre- and post-developed
         scenarios. The model includes a typical node-link connectivity identifying the catchments and
         hydraulic parameters. The proposed model was designed to reduce the increase of developed runoff
         to match pre-developed levels.
         The ARR Storm Generator was used based on the site coordinates to run all design storm events
         for events from the 10-minute storm to the 24-hour storm events.

6.3      XP- Modelling Assumptions and Methodology
         The following modelling assumptions were used to create the XP-STORM Models:

            Laurenson’s method was used for catchment routing with an ‘n’ value of -0.285 and ‘B’ value
            calculated by XP-STORM.

            Infiltration was modelled as ‘uniform loss’ with the following parameters:

             Impervious Areas
               ○ Initial loss of 1.0mm;
               ○ Continuing loss of 0.1mm/hr; and
             Pervious Areas
               ○ Initial loss of 27.0mm;
               ○ Continuing loss of 2.6mm/hr; and
             Note: initial and continuing losses were determined based on the AR&R 2016 storm generator
              values, which were calculated based on the site coordinates. Appropriate Manning’s ‘n’ values
              were used to suit the respective surfaces.
            Five (5) separate catchments were generated for the site, which were:

             One (1) Pre-Development Catchment; ‘A1’;
             One (1) Combined Post-Development Unmitigated Catchments B1, B2 and B3;


BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                             Page 12

Page 13

                                                                                    Noosa Residential Development
                                                                             Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                      August 2021
               ‘B1,B2&b3_Unmitigated’; and

             Three (3) Post-Development Mitigated Catchments B1, B2 & B3; ‘B1’, ‘B2’ and ‘B3’.

            A modelled representation of the bioretention basins were provided to capture storage that occurs
            over the bioretention extended detention zone;

            The bioretention basins were provided with separate outlets simulated using multi-links;

            Each node included runoff sub-catchments simulating the contributing areas;
            The sub-catchment areas were split into 0% impervious & 100% impervious areas;
            The models were run through all storms from 10min to 24-hour durations for all AR&R 2016
            generated storms to determine the critical storm events for each duration and AEP; and
            The model was run assuming both a free-outlet and a tailwater level at the outlet node to match
            the top of the downstream open-channel within the drainage covenant.

6.3.1    Pre-Development Case Model
         The pre-development scenario model consisted of nodes representing the pre-developed
         contributing catchments as described above. A link with negligible energy loss was added to the
         downstream end of the runoff node and connected to an outfall node as to provide a single point of
         comparison between the pre- and post-development cases.

6.3.2    Post-Development Case Model
         The Hydraulic mode of XP-Storm is used to assess the stormwater runoff calculated in the Runoff
         mode by introducing factors such as storage and outlet configurations. The developed model
         includes the nodes for the post-developed catchments shown in Table 2.

         Piped flows from catchments B1 and B2 are to be directed to flow diversion chambers, where low-
         flow outlet pipes will limit flows to the bioretention to an approximation of the 4EY event (Q3month
         event) to limit scouring of the bioretention. The balance of flows are to bypass the bioretention basins
         and flow directly to the LPD.

         A general link with negligible energy loss was added downstream of the post-developed model and
         connected to an outfall node to provide a single point of comparison between the pre and post-
         development cases.

         XP-STORM modelling indicated that 14.0m3 within the OSD tank is adequate to mitigate the
         discharged flows for peak events up to and including the 1% AEP event and ensure there is no
         increase in discharge for any and all storms for events up to and including the 24-hour, 1% AEP
         event to pre-development rates. This was tested assuming a limited flows in the open-channel at the
         LPD (free outlet) and assuming that the open-channel is running full (Fixed Backwater to 4.25m
         AHD).

         The proposed OSD outlet configurations are presented in Table 3.

                                        Table 3 – Detention Outlet Configuration

           Catchment / OSD            Low flow orifice                               Weir
                                                                  10m long weir 0.60m above OSD invert
                                                                   100mm above bioretention surface to
                   B1                         Nil
                                                                simulate combined length of top of 900x900
                                                                      pit in bio and overflow to swale
                                                                 3.6m long weir 0.25m above Bio retained
                                  100x500 low flow orifice
                                                                   water level to simulate length of top of
                   B2            at Bio retained water level
                                                                              900x900 pit in bio



BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                              Page 13

Page 14

                                                                                   Noosa Residential Development
                                                                             Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                      August 2021

         Detailed design and documentation of the OSD will be carried out once the development application
         has been approved by Council. Refer to Appendix C for the conceptual stormwater drainage layout
         and details.

6.4      Peak Storm Results
         A comparison between the peak discharge values between each of the XP-STORM modelled
         scenarios is presented in Table 4.

                        Table 4 – XP-STORM Modelling Peak Storm Mitigation Results (Free Outlet)
               Design     Pre-Development    Post-Development      Post-Development      Flow change from
               Storm           Flows         Flows, Unmitigated     Flows, Mitigated     Pre-Development
               (AEP)           (m3/s)              (m3/s)                (m3/s)                (m3/s)
                39%             0.177               0.282                 0.170               -3.95%
                20%             0.275               0.359                 0.256               -6.91%
                10%             0.325               0.490                 0.326                0.31%
                 5%             0.402               0.578                 0.391               -2.74%
                 2%             0.707               0.712                 0.644               -8.91%
                 1%             0.807               0.812                 0.744               -7.81%

               Table 5 – XP-STORM Modelling Peak Storm Mitigation Results (Full Open Channel at LPD)
               Design     Pre-Development    Post-Development      Post-Development      Flow change from
               Storm           Flows         Flows, Unmitigated     Flows, Mitigated     Pre-Development
               (AEP)           (m3/s)              (m3/s)                (m3/s)                (m3/s)
                39%             0.177               0.282                 0.182                2.82%
                20%             0.275               0.359                 0.252               -8.36%
                10%             0.325               0.490                 0.331                1.85%
                 5%             0.402               0.578                 0.390               -2.99%
                 2%             0.707               0.712                 0.688               -2.69%
                 1%             0.807               0.812                 0.790               -2.11%


         As seen in Table 4 and Table 5, the proposed OSD successfully mitigates the post-development
         flows either to pre-development conditions or with a negligible increase over pre-development flows.
         As seen in the graphed flow-time graphs in Appendix G the timing of peak flows for each post-
         development storm event is closely matched to the pre-development case.

6.5      Recommendation
         As demonstrated in Table 4 and Table 5 above, there has been an increase in peak flow from the
         pre to post development unmitigated stage. To mitigate this increase in flow 14.0m3 of OSD is
         proposed downstream of Catchment B1, which is shown to mitigate total peak site discharge to pre-
         development levels. A conceptual arrangement of the proposed detention system can be seen on
         sketch plan SK02 in Appendix C.

         This arrangement may be subject to modification at the detailed design phase. Final levels across
         the site may facilitate provision of storage over the bioretention basin or necessitate reconfiguration
         of the OSD tank dimensions / outlet arrangement.

6.6      Onsite Detention Lifecycle Costs
         A lifecycle cost analysis is not a part of the scope of this report. All stormwater infrastructure
         associated with the development shall be maintained and serviced by the owners of the development
         at no cost to Council.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                              Page 14

Page 15

                                                                                   Noosa Residential Development
                                                                             Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                      August 2021


7        STORMWATER QUALITY ASSESSMENT
7.1      Treatment Objectives
         This assessment identifies issues relating to stormwater quality runoff and assesses possible
         methods of treatment if required. The aim of this section of the report is to determine practical
         approaches to achieving improvements in the quality of the stormwater run-off from the site that can
         be readily implemented.

         The SPP 2017 proposes assessment benchmarks criteria which apply to ‘high-risk’ development for
         stormwater. The criteria include one or more of the following:

            A Material Change of Use (MCU) for an urban purpose which involves a premises greater than
            2,500m2 of land and;
             will result in an impervious area greater than 25% of the net developable area; or
             will result in six (6) or more dwellings;
             A Reconfiguration of a Lot (ROL) for urban purposes that involves a land area greater than
              2,500m2 and will result in six (6) or more lots; or
             Operational works for urban purposes that involve disturbing more than 2,500m2 of land.

         The proposal includes an MCU for a land area of 10,113 m2 that will result in impervious area equal
         to 56% of the developable area. Hence, the development is classed as ‘high risk’ for water quality
         and the SPP 2017 assessment benchmarks requirements will apply for the development.

         The SPP 2017 suggests the development aims to:

            Avoid or otherwise minimises adverse impacts on the environmental values of receiving waters,
            arising from:
             Altered stormwater quality and hydrology;
             Wastewater (other than contaminated stormwater and sewage);
             The creation or expansion of non-tidal artificial waterways;
             The release and mobilisation of nutrients and sediments;
             Development achieves the applicable stormwater management design objectives outlined in
              Tables A and B (SPP Appendix 2); and
             Development in a water supply buffer area avoids adverse impacts on drinking water supply
              environmental values.

         Appendix 2 (Table B) of SPP 2017 and Noosa Shire Council water quality and drainage code
         suggests ‘Post Construction Phase – Stormwater Management Design Objectives’ as:

                                   Table 6 - South East Queensland (SEQ) Targets
          Total Suspended Solids        Total Phosphorus        Total Nitrogen            Gross Pollutants
                   (TSS)                       (TP)                  (TN)                     >5mm

               80% Removal                60% Removal           45% Removal                 90% Removal


         The objective is to provide the following:

            Nitrogen and Phosphorous removal;
            Gross Pollutant and Suspended Solids removal;


BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                              Page 15

Page 16

                                                                                   Noosa Residential Development
                                                                             Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                      August 2021

            All of the site’s impervious areas discharge to suitable treatment device/s;
            Treatment device selection criteria are to be in accordance with Industry Best Practice and,
            WSUD Engineering Guidelines; and
            Provide engineering diagrams of the stormwater quality treatment of the proposed development.

7.2      Site Analysis and Design Strategy
7.2.1    Pre-Development Phase

         An Erosion Hazard Assessment has been carried out for the proposed development – refer to
         Appendix E for a copy of the completed NSC form. As a result of this assessment, it was determined
         that the overall site is a ‘low’ risk.

         Prior to construction commencing, the following erosion and sediment control measures will need to
         be installed around the subject site to minimise disturbance and ensure the quality of runoff
         discharging from the site is of an acceptable standard:

            Sediment barriers to be installed on all entrances to downstream stormwater infrastructure (i.e.
            gully pits);
            Designation of transport routes through the site to minimise vegetation disturbance;
            Maximise retention of existing vegetation to reduce soil disturbance and provide filter strip
            treatment for runoff;
            Install construction entry and exit shakedown areas;
            Sediment fences are to be installed on the downstream boundaries of the subject site; and
            Install dust control measures as required.

         All erosion and sediment control measures are to be designed and installed in accordance with Best
         Practice Erosion and Sediment Control" published by International Erosion Control Association
         (IECA). Further details regarding the proposed erosion and sediment control measures will be
         provided during the detailed design phase of the development.

         Further to the above considerations, it is the developments intent to limit changes to natural ground
         to a minimum.

7.2.2    Bulk Earthworks Phase

         During the bulk earthworks phase, the following erosion and sediment control measure will need to
         be installed in addition to the aforementioned measures (Pre-Development Phase) to ensure there
         is minimal disturbance to downstream receiving water bodies:

            Construction chutes to control runoff over earthworks batters;
            Construction of temporary bunds at the top of all earthworks batters to ensure runoff is directed
            away from exposed batters;
            Sediment basins to be constructed at low points within each stage of the proposed development;
            Sediment fences to be installed on the downstream side of any stockpiles; and
            Stabilisation of all batters upon reaching the finished earthworks levels.

         All erosion and sediment control measures are to be designed and installed in accordance with Best
         Practice Erosion and Sediment Control" published by International Erosion Control Association
         (IECA). Further details regarding the proposed erosion and sediment control measures will be
         provided during the detailed design phase of the development.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                              Page 16

Page 17

                                                                                   Noosa Residential Development
                                                                             Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                      August 2021

7.2.3    Construction Phase

         During the construction phase of the development, there is a risk of sedimentation transport due to
         disturbed land. The following erosion and sediment control measure will need to be installed in
         addition to the aforementioned measures (Pre-Development and Bulk Earthworks Phases) to ensure
         there is minimal disturbance and the quality of runoff is maintained to an acceptable standard:

            Construction of temporary diversion drains to divert water to sediment basins;
            Construction of temporary diversion drains to divert water to protect bioretention and treatment
            devices as required;
            Sediment barriers to be installed on all entrances to newly constructed stormwater infrastructure
            (i.e. gully pits);
            Sediment fences to be installed on the downstream side of any stockpiles and batters; and
            Re-vegetation of all disturbed areas within two (2) weeks of completion.

         All erosion and sediment control measures are to be designed and installed in accordance with Best
         Practice Erosion and Sediment Control" published by International Erosion Control Association
         (IECA). Further details regarding the proposed erosion and sediment control measures will be
         provided during the detailed design phase of the development.

7.2.4    Maintenance

         All erosion and sediment control devices are to be maintained through the entire phase of the
         development leading up to the operational phase. Erosion and sediment control devices will need to
         be monitored closely throughout the entire project to ensure they are operating correctly and
         efficiently. No erosion and sediment control devices are to be removed unless otherwise authorised
         by a suitably qualified engineer or the site superintendent.

7.3      Stormwater Quality Improvement Devices (SQIDs)
         A stormwater treatment train has been established to treat the runoff from the proposed development
         that includes the developable works area only (impervious carparking and units) and green space
         areas. The proposed treatment train will enable a higher level of pollutant removal efficiency by using
         stormwater quality improvement devices (SQIDs). Maintenance of the SQIDs will be the
         responsibility of the owners of the development. The maintenance should be carried out in
         accordance with the Council conditions of approval and Water by Design guidelines, such as Water
         by Design guidelines (2009) Maintaining Vegetated Stormwater Assets.

7.4      Operational Phase Treatment
         Once directed to be commissioned by the superintendent and engineers, the Stormwater Quality
         Improvement Devices (SQIDs) will provide the required level of stormwater quality treatment to runoff
         from the site prior to discharging into stormwater covenant and ultimately Council’s stormwater
         drainage infrastructure. It is expected that sediment laden runoff and the erosion potential at the
         subject site during the operational phase will be minimal. This is due to impervious developed areas
         in the form of roofs, driveways and carparking. It is understood that the footprint of these impervious
         areas has been reduced as much as practicable. The proposed landscaped areas will be maintained
         in a manner that will minimise erosion.

         Existing grassed and proposed landscaped areas will be maintained in a manner that will minimise
         erosion, some of which would be subject to erosion of topsoil from garden beds, erosion of soil from
         steep batters, etc.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                              Page 17

Page 18

                                                                                      Noosa Residential Development
                                                                               Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                         August 2021

7.4.1    Bioretention Basins

            Catchment B1: A minimum 80m2 bioretention basin (area measured at surface area).
            Catchment B2: A minimum 45m2 bioretention basin (area measured at surface area).

         Bioretention basins remove contaminants and sedimentation from stormwater runoff via infiltration
         through layers of soil media. The basin is made of a 400mm filter media layer and a 100mm transition
         layer located above in-situ soil. The basin is to be vegetated by plants with root bases to suit the filter
         depth, as per the landscape architect’s recommendations. These plants provide additional treatment
         and will reduce the clogging of the basin. Runoff within the bioretention area gradually infiltrates the
         soil layers, before discharging via sub surface drainage pipe. This pipe will discharge to the natural
         surface with scour control as detailed in QUDM.

7.4.2    Swale drains
         Grassed swales halt the movement of sediment lad runoff by slowing velocity and providing natural
         filtration. As such, removing water pollutants and improving water quality to meet the required
         treatment objectives mentioned in this report and ensure the prevention of sediment transportation.
         Grass-lined swales are to be used across the development site to augment the bioretention basin.

         A conceptual arrangement of the proposed grass line swales system can be seen in the ADG
         Stormwater Quality Plan SK02 in Appendix C.

7.5      MUSIC Model
         The sites stormwater run-off for the development was modelled using MUSIC (version 6.3.0) and the
         water quality objectives for South East Queensland specified in the SPP 2017 of 80% TSS reduction,
         60% TP reduction, 45% TN reduction, and 90% Gross Pollutants reduction.

         The results shown in Figure 4 meet the percent reduction water quality objectives identified by Noosa
         Shire Council standards and the SPP 2017.

         Details of the MUSIC model are attached within Appendix I for further information.

         Refer to Appendix C for the Preliminary Layout Plans prepared by this office.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                                Page 18

Page 19

                                                                                     Noosa Residential Development
                                                                            Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                       August 2021




                                     Figure 4 - Treatment train Layout and Results


7.6      On-site Treatment Lifecycle Costs
         A lifecycle cost analysis is not a part of the scope of this report. All the recommended water quality
         treatment infrastructure lies within the development site and it shall be maintained and serviced by
         the owners of the development at no cost to Council.

7.7      Water Quality Monitoring
         No water quality monitoring is proposed for this development at this stage due to the nature of the
         development and the expected pollutant levels.

7.8      Maintenance
         Maintenance of the SQIDs will be the responsibility of the owners of the development. The
         maintenance should be carried out in accordance with the manufacturer’s recommendations, Council
         conditions of approval and in accordance with the Water by Design (2009) Maintaining Vegetated
         Stormwater Assets guideline.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                              Page 19

Page 20

                                                                               Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                 August 2021


8        CONCLUSION
         In preparing this report, we have achieved all requirements for Site Based Stormwater Management
         Plans as described in the State Planning Policy (2017), Noosa Shire Council Planning Scheme
         Policies, Queensland Urban Drainage Manual (QUDM) 2016, Plumbing and Drainage Code
         AS3500.3 and Australian Rainfall and Runoff Guideline (ARR).




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                         Page 20

Page 21

                                                                               Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                 August 2021




                                                                                      Appendix A
                                                                                      Site Survey




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Page 22

Date :                04-03-2021
Drafted By :          DJC
Surveyed :            DJC
Checked By : ACC

DWG Name : 149231-01.dwg

Scale :               1:600@A3
Sheet Size : A3

12d File Ref : 149231-01

Level Datum : AHD Der.

Origin :         PSM 178114
                 RL 4.281
                 Hofmann Drive

CLIENT
            STOCKWELL
PROJECT
          PROPOSED
         DEVELOPMENT

Contour and Detail Survey
Over Part of Lot 3 on SP246584
   17 - 19 Hofmann Drive,
          Noosaville
Local Authority :
            Noosa Shire Council




          RPS Australia East Pty Ltd
               ACN 140 292 762
             ABN 44 140 292 762
   1 Innovation Parkway, Birtinya, Qld, 4575
   PO BOX 6149, Meridan Plains, Qld, 4551
                   T 07 5436 7888
                   F 07 5493 6630
                   W rpsgroup.com
          C COPYRIGHT PROTECTS THIS PLAN
          Unauthorised reproduction or amendment
          not permitted. Please contact the author.


Plan Reference                                Sheet
149231-01                                     1 of 1

Page 23

                                                                               Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                 August 2021




                                                                             Appendix B
                                                                  Architectural Drawings




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Page 24

                  
    

\ NOOSA CIVIC SHOPPING CENTER
\
EXISTING OPTIC LINE
\
EXISTING STORMWATER\LINE

 

EXISTING UNDERGROUND ;
ELECTRICAL LINE \

EXISTING STORMWATER MANHOLE

ove —~

si
—Bpsy-00e

REFER LANDSCAPE \
ARCHITECTS’ DRAWINGS FOR\
LANDSCAPING AREA \

COMMUNAL:
RECREATION AREA

 

  
               

 

        
 

FI

TYPE

         

 

 

  

tay V

 

 

verter \\\

LL

o
'YPE 1A° SUTYPE 2A, TYPE 2C,
aes BI CTYPE 2097

 

 

 

 

 

  

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RK pA | 8 CARPARKS:
rH caer

 

 

 

 

 

 

 

 

 

 

 

 

3000
rent
1
3
al

 

 

BIO RETENTION

 

 

 

    

 

zeae

    

 

 

 

 

 

EXISTING SEWER LINE:

    

<——— EXISTING ELETRICAL LINE

EXISTING WATER METER ==>
EXISTING STORMWATER

    

EXISTING WATER LINE

 

 

LINE
Project No: 20225
soeannst Noosa NN ORIVE, - Scale: 1: 400@ A3
nn NOOSA : : 400¢
Fortitude Valley QLD 4006 a Drawn / Check: AuChecker
T +617 3253 9900 sTockweur DEVELOPMENT APPROVAL DA100

[email protected]
These designs and plans are the copyright of MODE DESIGN Corp, Pty Ltd and cannot be reproduced without written Do not scale off this drawing

  

Page 25

                                                                               Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                 August 2021




                                                                             Appendix C
                                                                  Preliminary Civil Plans




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Page 26

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    219°40
                                                  E
                                                                                                                                                                                                                                                                                                                                                                                                                                                            E




                                                                                                                                                                                                                            OP




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       2 27 1
                                                                                                                                                                                                                                                                                                                                                                                                                            SW

                                                                                                                                                                                                                                                  NOOSA CIVIC SHOPPING CENTER                                                                                                                                                        E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           '35"
                                                                                                                                                                                                                                                                                                                                                                                            SW                 E                                                                RL: 4.15
                                                                                                                                                             UNDERSTOOD THAT
                                                                                                                                                                                                                                                                                     2
                                                                                                                                                                                                                                                                                    DA200 BIO SURFACE: 4.40                                     SW
                                                                                                                                                                                                                                                                                                                                                                                            E
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 B3             IL: 3.55
                                                                                                                                                                                                                                                                                                                                                                     E
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          RL 3.50




                                                             E
                                                                                                                                                             EARTHWORKS TO TAKE PLACE.                                                                                                                                                                                             RL: 4.50
                                                                                                                                                                                                                                                                                          TWL IN BIO: 4.50SW                             E
                                                                                                                                                                                                                                                                                                                                                                                                                                       WA            LE                                                                                                RL 3.40
                                                                                                                                                                                                                                                                                                                                                                                                                                  OW S




                                                                                                                                                                                                                                   OP
             EXISTING OPTIC LINE                                                                                                                             EXISTING BATTER TO BE                                                                                                                                        E                                                                                             F        L
                                                                                                                                                                                                                                                                                                                                                                                                                   HIGH




                                                                                                                                                                                                                                                                                                                                                                                                                       SW
                                                                                                                                                             STEEPENED TO MAX 1:2, PENDING                                                                                                                                                                                         7.000
                                                                                                                                                                                                                                                                                            SW          E
             EXISTING STORMWATER LINE                                                                                                                                                                                                                                                                                                                                                                                                                       IPE
                                                                                                                                                             ASSESSMENT AND CERTIFICATION                                                                                             E
                                                                                                                                                                                                                                                                                                                                                                                                                                   FL          OW P                                                     5.20
                                                                                                                                                                                                                                                                                                                                                                                    6.000
                                                                                                                                                                                                                                                                                                                                                                                                                             5 LOW




                                                                      E
                                                                                                                                                             BY GEOTECHNICAL ENGINEER                                                                         SW
                                                                                                                                                                                                                                                                                                                                             PIT TOP: 4.50
                                                                                                                                                                                                                                                                                                                                                                                                                   DN37
                                                                                                                                                                                                                                                                   E
             EXISTING UNDERGROUND                                                                                                                                                                                                                             '45"
                                                                                                                                                                                                               SW                  E                   119°16                                                                                IL: 3.70                                                                                                                                             LOCAL EXCAVATION
                                                                                                                                                                                                                                                                                                                                                                                      5.000
             ELECTRICAL LINE                                                                                                                                                                                                                             41 0
                                                                                                                                                                                                                                                            5 5




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  206°49
                                                                                                                                                                                                                                             OP
                                                                                                                                                                                                    E                                                                                                                                                                                                                                                                                             TO BRANCH EXISTING




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    25 40 5
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  OPEN-CHANNEL TO




                                                                              E
                                                                                                                                                                                  SW    E

             EXISTING STORMWATER MANHOLE                                                                                                                                                                                                                                                                            SWALE       80m2
                                                                                                                                                                                                                                                                                                                                     Bio                                                                                                                               TYPE 3A                    SITE BOUNDARY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  N




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         '45"
                                                                                                                                                             E
                                                                                                                                             SW




                                                                                           7.30
                                                                                                                               E

             REFER LANDSCAPE                                                                          SW
                                                                                                                                                                                                                                                                                                                                                                                                        5.20                         TYPE 3B
                                                                                                               E




                                                                                    7.33
             ARCHITECTS' DRAWINGS FOR




                                                                                                                                                                                                                                                  OP
             LANDSCAPING AREA                                                                                                                                         RL: 5.00                                                                                                                                                                                                                               2167
                                                                                                                                                                      IL: 4.60                                                                                                            Q3MONTH
                                                                                                                                                                                                                                                                                          FLOWS                                                                                                                                                                                                                                        2
                                                                                                                                                                                                                     BIO RETENTION
                                                                                                                                                                                                                                                                                                                          RL: 4.95
                                                                                                                                                                                                                                                                                                                                                                                                                                                              TYPE 2B                                                                 DA201
                                                                                                                                                                                                                                                                                                                          IL: 4.45                                                                                                               EXISTING NORTH




                                                                                                                                                                                                                                                         OP
                                                                                                                                                                                                                36°13'55"
                                                                                                                                                                                                                                                                                                                                                                                                                                                 TO SOUTH OPEN                                                                      RL: 5.00
                              SETBA




                                                                                                                                                                                                                  69709
                                                                                                                                                                                                                                                                                                                                              PERGOLA HIGH-FLOW                                                                              TYPECHANNEL
                                                                                                                                                                                                                                                                                                                                                                                                                                                  2A                                                                                IL: 4.50
                               10000




                                                                                                                                             PERGOLA




                                                                                                                                                                                                                                                                                                                                                                     213°03
                                                                 RL: 5.11                                                                                                                                                                                                                                                                             BYPASS PIPE




                                                                                                                                                                                                                                                                                                                                                                       78 66 1
                                                                 IL: 4.61
                                    CK




                                              5.00                                                                                                                                                                                                                                                                                                                                                                                                                                            TYPE 2B




                                                                                                                                                                                                                                                                                                                                                                            '30"
                                                      0
                                                                                                                                                                       POOL




                                                                                                                                                                                                                                                                   OP
                                                                                                                                                                       PUMP
                                                                                                                                                                                                                                                                                                          COMMUNAL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     BUILDING C




                                                                                                                                                                                                             3100
                                               300                                                                                                                                                                   16300                                                                             RECREATION AREA                                                                                                                          TYPE 2A
                                            SET 0                                                                                                                     WC
                                               BAC
                                                   K
                                                                                                                                                                                                         POOL
                                            5.20                          5.20                                                                        5.20                                                                              OP
                                                                                                                                                                                                                                                                        OP
                                                                                                                                                                                                                                                                                                        B1
                OP                                                                                                                                                                                  OP
                                  51 07 '




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 TYPE 2A
                                        7




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      5.10
                                       8




                                                                                                                                                                                       OP
                                   60°1




                                                                                                                                                                                                               RL: 5.10                                                                                                                                                                                                                               TYPE 1A
                                                                                                                                                        OP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           CVJ
                                                                                                                          OP                                                                                   IL: 4.60                                                                                                                                                                                                                                                                                                                                        84 5
                                                                                                      OP
                                                                                                                                                                                                                                                                                                                                                                                   RL: 5.10
                                                                                                                                                                                                                                                                                                                                                                                                                       5.20                                                                                                                              S 182
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          P
              DA201




                                      OP                               OP
                1




                                                  OP



                                                                                                                                                                                                                                                                                           3
                                                                                                                                                                                                                                                                                                                                                                                   IL: 4.55




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     FFL. 5




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         208°44
                                                                                                                                                                                                                            5.20                                                                                                                                                                                                                                                                    TYPE 2A




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       .35
                                                                                                                                                                                                                                                                                                                                                                                                 5.20




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           35 80 0
                                                           TYPE 2C                                                                                                                                                                                                       5.20
                                                                                  TYPE 2A




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                '35"
                                                                                                               TYPE 1A                                                                                                                                                                                                                                                                                                                                               MANAGER
                                                                                                                                             TYPE 2B                                                                                              5.20                                                                                                                                                              SEATING
                                                                                                                                                                       TYPE 2A                                                                                                                                                                                                                                       LETTER
                                                                                                                                                                                                                                                                                                                                                                                                                     BOXES               5
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       REFUSE                            TYPE 2C                                       RL: 5.00
                                                                                                                                                                                                  TYPE 3A                                                                                                                                                                                                                                                                                                                                              IL: 4.38
                                                                                                               BUILDIN                                                                                                                                                             TYPE 3A                      TYPE 2B          TYPE 1A                TYPE 2A                        TYPE 2C
                                                                                                                      G                       A                  FFL. 5.35
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                PUMP

                                                  TYPE 2C
                                                                          TYPE 1A
                                                                                                                    TYPE 1A
                                                                                                                                                                                                                                                                                                   FFL. 5.35
                                                                                                                                                                                                                                                                                                                              BUILDING B                                                                                                               8 CARPARKS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  BIO TO OUTLET
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  TO EXISTING
                                                                                                                                                  TYPE 2A                                                           IL: 5.13                                                                                                                                                                                                                                FFL 5.25                                                                              OPEN-CHANNEL
                                                                                                                                                                                 TYPE 2A                            RL: 4.63                                                                                                                                                                                                                                           BIO SURFACE: 4.25                                                          TO EAST
              M SB                         5.20                                                                                                                                                                                                                                                                                                                                            TYPE 2C                                                                     TWL IN BIO: 4.35
W
                        PADMOUNT
                                                                                                                                                                                                TYPE 1B
                                                                                                                                                                                                                                                                                 TYPE 1B
                                                                                                                                                                                                                                                                                                 B2
                                                                                                                                                                                                                                                                                                 TYPE 2A            TYPE 1A                             TYPE 1A                                                                              4.000
                        TRANSFORMER                                                                                                                                                                                                              3
                328°
                     52
                                       5.00                   B3                                                                                                                                                                             SP 246583                                                                                                                                                                                                                                                  1:5
               1163 '                                                                                                                                                                                                                                                                                                                                                                                                                                                     1:8                                  TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         RAMP ENT
                   3              W


                                                             328°38                                                                                                                                      5.20
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         BA SE M                 RL: 3000
                                                                  W '3 0"                                          5.20
                                                                                                                                                                                                                                                                    5.20                                                                                                                         5.20                                                                                                                            5.00SETBACK
                                                              26 5 71                                                                                                                                                                                                                                                                                                                                                                                                                                                BIO RETENTION
     S                                                                                                     W
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              45m2 Bio




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        215°32'
                                                                                                                                                                                                                                                                                                                                                                                                                                                          1:10




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         25884
               KERB ADAPTOR/S




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 10000
                                                                          5.000




                                                                                                                                                                                                                                                                                                                                                                                                                                                                           SIGNAGE




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          8000
                                                                                                                                                  W
             EXISTING WATER
                        S
                            LINE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        RL:                PIT TOP: 4.60




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  6000
                                                                                                                                                                                                                                                                                                                                                                                                        IL: 5.10                                                                        WATER METE
                        S
                                                                                                                                                                                            W
                                                                                                                                                                                                 318°25'                                                                                                                         5.20                                                                                                                                                              R
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           IL: 3.45
                                                             S
                                                                                                                                                                                                                                                                                                                                                                                                        RL: 4.35W 7°58
                                                                                                                                                                                                                                                                                                                                                                                                               30      '                                         W
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        BOOSWTER                        4.80
             EXISTING SEWER MANHOLE                                                                                                                                                              26571IL: 5.05 W                                                             W    313°11'35"                                                                             307°58'
                                                                                                                                                                                                                                                                                                                                                                             W                                                                                                                                                         314°49'50"
                                                                                                                                                                                                                                                                                                            W                        W
                                                                                                                                                                                                                                                                                                                                                                          19232                                  8657                                                                                                           W
                                                       S
                                                                                                           S                                                                                             RL: 4.55                                                                   26571                                                                                                                                                                                                                                                29380           W



                                                                                                                                              S
                                                                                                  S
             EXISTING SEWER LINE
         LEGEND:

                                                                                                                                                                                                                                                                                                                                                 4.59
                                                                                                                                                                                                                                                                                                                                                 4.58
                                                                                                                                                                                        S
                                                                                                                                  S
                                                                                                                                                                                                                     S
                                                                                                                                                                             S
                                                                                                                                                                                                                                                                                                                                                                                                                                             4m SET-BACK TO BIO
                                            CATCHMENT                                                                                        INLET PIT AND                                                                                                                                HOFMANN DRIVE                                                                                                                                      FROM SITE BOUNDARY
                                                                                                                                                                                                         S
                                                                                                                                                                                                                                                                                                                                                 RCV ( Front Lift)
                                                                                                                               4.88




                                                                                                                                      5.06




                                                                                                                                                                                                                                                                     1                                                                                                                                                                                                                                  DEMOLISH EXISITING CONENCTION
         W
                                            BOUNDARY                                                                                         STORMWATER PIPE




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         SW
                              E
                                                 EXISTING ELETRICAL LINE                                                                                                                                                                                           DA200                                                                                                                                                                                                                                AND CONSTRUCT    NEW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            EXISTING WATER    OUTLET WITH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           METER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        HEADWALL TO OPEN CHANNEL
                 B1                         CATCHMENT
                                                 EXISTINGID
                                                          WATER LINE
                                                                                                                                             GRASS-LINED                                                                                                                                                                                                                                                                                                                                                    EXISTING STORMWATER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            LINE
                                                                                                                                             SWALE


                                    BRISBANE                                                                                                                                                                                     NOOSA APARTMENT                                                                                              STOCKWELL DEVELOPMENT GROUP PTY LTD
                                                                                                                                                                                                                                                                                                                                                             SITE PLAN                                                  STRUCTURAL
                                                                                                                                                                                                                                                                                                                                                                                                                        CIVIL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          PRELIM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          INFORMATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         STORMWATER QUALITY PLAN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Project No:           20225




                                                                                                                                                                                                                                                                                                                                                                                                                                                          DRAFT
                                    Plaza Level, Mosaic                                                                                                                                                                          HOFMANN DRIVE,                                                                                                NOOSA RESIDENTIAL DEVELOPMENT                                                MRB                       MVI                  MVI
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Date:
                                    826 Ann St                                                                                                                                                                                   NOOSA                                                                                                         17-19 HOFMAN DRIVE, NOOSAVILLE QLD 4566                                                                                                                      Scale:         1 : 400@ A3
                                    Fortitude Valley QLD 4006                                                                                                                                                                                                                                                                                                                                                               24553                     MRB                 1:200 @ A1                        Drawn / Check: Author
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Checker
    02       27.07.21               TINFORMATION
                            ISSUED FOR   +61 7 3253 9900                                                                                                                                                                         DEVELOPMENT APPROVAL                                                                                                                                                                                                                     1:400 @ A3

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            DA100
    01       25.06.21       ISSUED FOR INFORMATION
                                    [email protected]                                                                                                                                                                                                                                                                                                                                                                                                                                                SK02                                                        02

                                  These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written                                                                                Do not scale off this drawing
                                  permission

Page 27

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     219°40
                                                  E
                                                                                                                                                                                                                                                                                                                                                                                                                                                             E




                                                                                                                                                                                                                             OP




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        2 27 1
                                                                                                                                                                                                                                                                                                                                                                                                                             SW

                                                                                                                                                                                                                                                   NOOSA CIVIC SHOPPING CENTER                                                                                                                                                        E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            '35"
                                                                                                                                                                                                                                                                                                                                                                                             SW                E                                                                 RL: 4.15
                                                                                                                                                                                                                                                                                      2
                                                                                                                                                                                                                                                                                     DA200 BIO SURFACE: 4.40                                     SW
                                                                                                                                                                                                                                                                                                                                                                                             E
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  B3             IL: 3.55
                                                                                                                                                                                                                                                                                                                                                                      E
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           RL 3.50




                                                             E
                                                                                                                                                                                                                                                                                                                                                                                    RL: 4.50
                                                                                                                                                                                                                                                                                           TWL IN BIO: 4.50SW                             E
                                                                                                                                                                                                                                                                                                                                                                                                                                        WA            LE                                                                                                RL 3.40
                                                                                                                                                                                                                                                                                                                                                                                                                                   OW S




                                                                                                                                                                                                                                    OP
             EXISTING OPTIC LINE                                                                                                                                                                                                                                                                                           E                                                                                            F         L
                                                                                                                                                                                                                                                                                                                                                                                                                   HIGH




                                                                                                                                                                                                                                                                                                                                                                                                                        SW
                                                                                                                                                                                                                                                                                                                                                                                    7.000
                                                                                                                                                                                                                                                                                             SW          E
             EXISTING STORMWATER LINE                                                                                                                                                                                                                                                                                                                                                                                                                        IPE
                                                                                                                                                                                                                                                                                       E
                                                                                                                                                                                                                                                                                                                                                                                                                                    FL          OW P                                                     5.20
                                                                                                                                                                                                                                                                                                                                                                                     6.000
                                                                                                                                                                                                                                                                                                                                                                                                                              5 LOW




                                                                      E
                                                                                                                                                                                                                                                               SW
                                                                                                                                                                                                                                                                                                                                              PIT TOP: 4.50
                                                                                                                                                                                                                                                                                                                                                                                                                    DN37
                                                                                                                                                                                                                                                                    E
             EXISTING UNDERGROUND                                                                                                                                                                                                                              '45"
                                                                                                                                                                                                                SW                  E                   119°16                                                                                IL: 3.70                                                                                                                                             LOCAL EXCAVATION
                                                                                                                                                                                                                                                                                                                                                                                       5.000
             ELECTRICAL LINE                                                                                                                                                                                                                              41 0
                                                                                                                                                                                                                                                             5 5




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   206°49
                                                                                                                                                                                                                                              OP
                                                                                                                                                                                                     E                                                                                                                                                                                                                                                                                             TO BRANCH EXISTING




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     25 40 5
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   OPEN-CHANNEL TO




                                                                              E
                                                                                                                                                                                   SW    E

             EXISTING STORMWATER MANHOLE                                                                                                                                                                                                                                                                             SWALE       80m2
                                                                                                                                                                                                                                                                                                                                      Bio                                                                                                                               TYPE 3A                    SITE BOUNDARY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   N




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          '45"
                                                                                                                                                              E
                                                                                                                                              SW




                                                                                           7.30
                                                                                                                                E

             REFER LANDSCAPE                                                                          SW       E
                                                                                                                                                                                                                                                                                                                                                                                                   5.20                               TYPE 3B
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     EXISTING STORMWATER


                                                                                    7.33
             ARCHITECTS' DRAWINGS FOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     COVENANT J.




                                                                                                                                                                                                                                                   OP
             LANDSCAPING AREA                                RETAIN VEGETATION ALONG REAR                                                                              RL: 5.00                                                                                                                                                                                                                               2167
                                                                                                                                                                       IL: 4.60                                                                                                            Q3MONTH                                                                                                                                                                                                                                   NO VEGETATION
                                                             BOUNDARY. REFER TO LANDSCAPE                                                                                                                                                                                                  FLOWS
                                                                                                                                                                                                                      BIO RETENTION                                                                                                                                                                                                                                                                                                  REMOVAL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        2
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              WITHIN
                                                             ARCHITECT PLANS                                                                                                                                                                                                                                               RL: 4.95                                                                                                                                                                                                    DA201
                                                                                                                                                                                                                                                                                                                           IL: 4.45
                                                                                                                                                                                                                                                                                                                                                                                                                                                               TYPE 2B
                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING NORTH                                                                     COVENANT




                                                                                                                                                                                                                                                          OP
                                                                                                                                                                                                                 36°13'55"
                                                                                                                                                                                                                                                                                                                                                                                                                                                  TO SOUTH OPEN                                                                      RL: 5.00
                              SETBA




                                                                                                                                                                                                                   69709
                                                                                                                                                                                                                                                                                                                                               PERGOLA HIGH-FLOW                                                                              TYPECHANNEL
                                                                                                                                                                                                                                                                                                                                                                                                                                                   2A                                                                                IL: 4.50
                               10000




                                                                                                                                              PERGOLA




                                                                                                                                                                                                                                                                                                                                                                      213°03
                                                                 RL: 5.11                                                                                                                                                                                                                                                                              BYPASS PIPE




                                                                                                                                                                                                                                                                                                                                                                        78 66 1
                                                                 IL: 4.61
                                    CK




                                               5.00                                                                                                                                                                                                                                                                                                                                                                                                                                            TYPE 2B




                                                                                                                                                                                                                                                                                                                                                                             '30"
                                                      0
                                                                                                                                                                        POOL




                                                                                                                                                                                                                                                                    OP
                                                                                                                                                                        PUMP
                                                                                                                                                                                                                                                                                                           COMMUNAL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      BUILDING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        FFL 5.35 C




                                                                                                                                                                                                              3100
                                                300                                                                                                                                                                   16300                                                                             RECREATION AREA                                                                                                                          TYPE 2A
                                             SET 0                                                                                                                     WC
                                                BAC
                                                    K
                                           5.20                              5.20                                                                                                                         POOL
                                                                                                                                                                                                                                         OP
                                                                                                                                                                                                                                                                         OP
                                                                                                                                                                                                                                                                                                         B1
                OP                                                                                                                                                                                   OP
                                  51 07 '




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  TYPE 2A
                                        7




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       5.10
                                       8




                                                                                                                                                       5.20                             OP
                                   60°1




                                                                                                                                                                                                                RL: 5.10                                                                                                                                                                                                                               TYPE 1A
                                                                                                                                                         OP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            CVJ
                                                                                                                          OP                                                                                    IL: 4.60                                                                                                                                                                                                                                                                                                                                        84 5
                                                                                                      OP
                                                                                                                                                                                                                                                                                                                                                                                    RL: 5.10                        5.20                                                                                                                                  S 182
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           P
              DA201




                                      OP                               OP
                1




                                                  OP



                                                                                                                                                                                                                                                                                            3
                                                                                                                                                                                                                                                                                                                                                                                    IL: 4.55




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      FFL. 5




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          208°44
                                                                                                                                                                                                                             5.20                                                                                                                                                                                                                                                                    TYPE 2A




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        .35
                                                                                                                                                                                                                                                                                                                                                                                                  5.20




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            35 80 0
                                                           TYPE 2C                                                                                                                                                                                                        5.20
                                                                                  TYPE 2A




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 '35"
                                                                                                               TYPE 1A                                                                                                                                                                                                                                                                                                                                                MANAGER
                                                                                                                                              TYPE 2B                                                                                              5.20                                                                                                                                                              SEATING
                                                                                                                                                                        TYPE 2A                                                                                                                                                                                                                                       LETTER
                                                                                                                                                                                                                                                                                                                                                                                                                      BOXES               5
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        REFUSE                            TYPE 2C                                       RL: 5.00
                                                                                                                                                                                                   TYPE 3A                                                                                                                                                                                                                                                                                                                                              IL: 4.38
                                                                                                               BUILDIN                                                                                                                                                              TYPE 3A                      TYPE 2B          TYPE 1A                TYPE 2A                        TYPE 2C
                                                                                                                      G        FFL 5.35        A                  FFL. 5.35
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 PUMP

                                                  TYPE 2C                                                                                                                                                                                                                                                                        FFL 5.35
                                                                          TYPE 1A
                                                                                                                    TYPE 1A
                                                                                                                                                                                                                                                                                                    FFL. 5.35
                                                                                                                                                                                                                                                                                                                               BUILDING B                                                                                                               8 CARPARKS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   BIO TO OUTLET
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   TO EXISTING
                                                                                                                                                   TYPE 2A                                                           IL: 5.13                                                                                                                                                                                                                                FFL 5.25                                                                              OPEN-CHANNEL
                                                                                                                                                                                  TYPE 2A                            RL: 4.63                                                                                                                                                                                                                                            BIO SURFACE: 4.25                                                         TO EAST
              M SB                         5.20                                                                                                                                                                                                                                                                                                                                             TYPE 2C                                                                      TWL IN BIO: 4.35
W
                        PADMOUNT
                                                                                                                                                                                                 TYPE 1B
                                                                                                                                                                                                                                                                                  TYPE 1B
                                                                                                                                                                                                                                                                                                  B2
                                                                                                                                                                                                                                                                                                  TYPE 2A            TYPE 1A                             TYPE 1A                                                                              4.000
                        TRANSFORMER                                                                                                                                                                                                               3
                328°
                     52
                                       5.00                   B3                                                                                                                                                                              SP 246583                                                                                                                                                                                                                                                  1:5
               1163 '                                                                                                                                                                                                                                                                                                                                                                                                                                                      1:8                                  TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          RAMP ENT
                   3              W


                                                             328°38                                                                                                                                       5.20
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          BA SE M                 RL: 3000
                                                                  W '3 0"                                          5.20
                                                                                                                                                                                                                                                                     5.20                                                                                                                         5.20                                                                                                                            5.00SETBACK
                                                              26 5 71                                                                                                                                                                                                                                                                                                                                                                                                                                                 BIO RETENTION
     S                                                                                                     W
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               45m2 Bio




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         215°32'
                                                                                                                                                                                                                                                                                                                                                                                                                                                           1:10




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          25884
               KERB ADAPTOR/S




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  10000
                                                                          5.000




                                                                                                                                                                                                                                                                                                                                                                                                                                                                            SIGNAGE




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           8000
                                                                                                                                                   W
             EXISTING WATER
                        S
                            LINE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         RL:                PIT TOP: 4.60




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   6000
                                                                                                                                                                                                                                                                                                                                                                                                         IL: 5.10                                                                        WATER METE
                        S
                                                                                                                                                                                             W
                                                                                                                                                                                                  318°25'                                                                                                                         5.20                                                                                                                                                              R
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            IL: 3.45
                                                             S
                                                                                                                                                                                                                                                                                                                                                                                                         RL: 4.35W 7°58
                                                                                                                                                                                                                                                                                                                                                                                                                30      '                                         W
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         BOOSWTER                        4.80
             EXISTING SEWER MANHOLE                                                                                                                                                               26571IL: 5.05 W                                                             W    313°11'35"                                                                             307°58'
                                                                                                                                                                                                                                                                                                                                                                              W                                                                                                                                                         314°49'50"
                                                                                                                                                                                                                                                                                                             W                        W
                                                                                                                                                                                                                                                                                                                                                                           19232                                  8657                                                                                                           W
                                                       S
                                                                                                           S                                                                                              RL: 4.55                                                                   26571                                                                                                                                                                                                                                                29380           W




         LEGEND:
             EXISTING SEWER LINE                                                                  S
                                                                                                                                               S




                                                                                                                                                                                                                                                                                                                                                  4.59
                                                                                                                                                                                                                                                                                                                                                  4.58
                                                                                                                                                                                         S
                                                                                                                                   S
                                                                                                                                                                                                                      S
                                                                                                                                                                              S
                                                                                                                                                                                                                                                                                                                                                                                                                                              4m SET-BACK TO BIO
                                            EARTHWORKS CUT                                                                                                                                                                                                                                 HOFMANN DRIVE                                                                                                                                      FROM SITE BOUNDARY
                                                                                                                                                                                                          S
                                                                                                                                                                                                                                                                                                                                                  RCV ( Front Lift)
                                                                                                                                4.88




                                                                                                                                       5.06




         W                                                                                                                                                                                                                                                            1                                                                                                                                                                                                                                  DEMOLISH EXISITING CONENCTION




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          SW
                                                            EXISTING ELETRICAL LINE                                                                                                                                                                                 DA200                                                                                                                                                                                                                                AND CONSTRUCT    NEW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             EXISTING WATER    OUTLET WITH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            METER
                     B1       E
                                              EARTHWORKS FILL
                                                                                                                                               GRASS-LINED                                                                                                                                                                                                                                                                                                                                               HEADWALL TO OPEN CHANNEL
                                                                                                                                               SWALE                                                                                                                                                                                                                                                                                                                                                         EXISTING STORMWATER
                                                            EXISTING WATER LINE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             LINE



                                    BRISBANE                                                                                                                                                                                      NOOSA APARTMENT                                                                                              STOCKWELL DEVELOPMENT GROUP PTY LTD
                                                                                                                                                                                                                                                                                                                                                              SITE PLAN                                                  STRUCTURAL
                                                                                                                                                                                                                                                                                                                                                                                                                         CIVIL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            PRELIM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            INFORMATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          PRELIMINARY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Project No:EARTHWORKS PLAN20225




                                                                                                                                                                                                                                                                                                                                                                                                                                                           DRAFT
                                    Plaza Level, Mosaic                                                                                                                                                                           HOFMANN DRIVE,                                                                                                NOOSA RESIDENTIAL DEVELOPMENT                                                DSM                       MVI                  MVI
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Date:
                                    826 Ann St                                                                                                                                                                                    NOOSA                                                                                                         17-19 HOFMAN DRIVE, NOOSAVILLE QLD 4566                                                                                                                      Scale:         1 : 400@ A3
                                    Fortitude Valley QLD 4006                                                                                                                                                                                                                                                                                                                                                                24553                     DSM                  1:200 @ A1                       Drawn / Check: Author
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Checker
                                    T +61 7 3253 9900                                                                                                                                                                             DEVELOPMENT APPROVAL                                                                                                                                                                                                                      1:400 @ A3

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             DA100
    01       09.08.21       ISSUED FOR INFORMATION
                                    [email protected]                                                                                                                                                                                                                                                                                                                                                                                                                                                 SK03                                                        01

                                  These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written                                                                                 Do not scale off this drawing
                                  permission

Page 28

                                                                               Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                 August 2021




                                                                         Appendix D
                                                                 NSC Code Responses




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Page 29

Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                        COMMENTS
 Floodplain protection, immunity and safety - for                  AO1
 development areas                                                 The finished flood level is not less than the minimum      N/A Noosa Shire Council mapping
 PO1                                                               design levels specified in Table 8.2.6.4                   indicates that the development is
 Development provides that for all flood events up to and                                                                     outside flood effected areas.
 including the DFE:
      1. the safety of people on the site is protected; and
      2. the risk of damage to property on the site is avoided
           or minimised as far as practicable.
 PO2                                                               AO2                                                        N/A Noosa Shire Council mapping
 All lots have sufficient area that is above the DFE flood level   The minimum area above flood level (flood free area) for   indicates that the development is
 or where modelling is not available, the highest                  each lot, is in accordance with Table 8.2.6.5.             outside flood effected areas.
 recorded flood level, to safely and adequately accommodate
 the intended use.




Page 1 of 9
June 2021

Page 30

Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                          COMMENTS
 PO3                                                               AO3                                                          N/A This report is to accompany an
 For reconfiguring a lot or operational works, development is      Development areas are not filled to reduce flood risk.       MCU.
 undertaken in a manner that ensures:

              1. natural hydrological systems are protected from
                 erosion, scour or flood damage on the premises
                 or other premises;
              2. natural landforms and drainage lines are
                 maintained to protect the hydraulic performance
                 of waterways and flood plain; and
              3. development integrates with the natural
                 landform rather than modifying the landform to
                 suit the development as far as practicable.

 PO4                                                               AO4.1                                                        N/A Noosa Shire Council mapping
 For reconfiguring a lot, development does not compromise          Development provides an effective evacuation route that      indicates that the development is
 the safety of people resulting from the flood risk associated     remains passable, with sufficient flood warning time, to     outside flood effected areas.
 with events exceeding the DFE.                                    enable people to progressively evacuate to safe areas
                                                                   above the PMF in the face of advancing flood or waters for
                                                                   events that exceed the DFE.

                                                                   OR
                                                                   AO4.2                                                        N/A Noosa Shire Council mapping
                                                                   Development provides for an area of sufficient size and      indicates that the development is
                                                                   dimensions on site above the PMF that allows for safe        outside flood effected areas.
                                                                   congregation and refuge.




Page 2 of 9
June 2021

Page 31

Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                           ACCEPTABLE OUTCOMES                                           COMMENTS
                                                AO4.3                                                         N/A Noosa Shire Council mapping
                                                Where the existing roads servicing a development provide      indicates that the development is
                                                a specific flood immunity (as determined by the Qld           outside flood effected areas.
                                                Transport Road and Drainage Design Manual, Queensland
                                                Urban Drainage Manual and the Australian Rainfall and
                                                Runoff Guide), all lots have access to the flood free area
                                                identified in Table 8.2.6.5 that matches the road immunity.




Page 3 of 9
June 2021

Page 32

Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                             ACCEPTABLE OUTCOMES                                          COMMENTS
 PO5                                                              AO5                                                          N/A Noosa Shire Council mapping
 For reconfiguring a lot or operational works, development        In the Flood Hazard Overlay, or in areas otherwise           indicates that the development is
 does not directly, indirectly or cumulatively alter the flood    determined to be subject to the DFE or DSTE, development     outside flood effected areas.
 characteristics external to the development site for all
                                                                  ensures:
 flooding and inundation events up to and including
 the DFE or DSTE based on:                                                  1. there is no loss of on-site flood storage
                                                                               capacity;
              1. current climate conditions; and                            2. all changes to level, depth, duration and
              2. incorporating an appropriate allowance for the                velocity of floodwaters are contained within
                 predicted impacts of climate change.                          the site for all flood events up to and
                                                                               including the DFE based on current climate
                                                                               and predicted impacts of climate change at
                                                                               2100;
                                                                            3. there is no acceleration or retardation of
                                                                               flows, or any retardation in flood warning
                                                                               times, elsewhere on the floodplain and to any
                                                                               overland flow paths; and
                                                                            4. there is no increased stormwater ponding on
                                                                               sites upstream, downstream or in the general
                                                                               vicinity of the site.
 Resilient building design and form                               AO6.1                                                        N/A Noosa Shire Council mapping
 PO6                                                              Buildings are designed to integrate well with the street     indicates that the development is
 Development ensures that building design and building form:      level and the levels of adjoining properties to facilitate   outside flood effected areas.
          1. accounts for potential flood risk;
                                                                  pedestrian flows and visual and physical connectivity
          2. is resilient to flood events; and
                                                                  between the footpath and ground floors.




Page 4 of 9
June 2021

Page 33

Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                           COMMENTS
              3. maintains a functional and attractive street   AO6.2                                                         N/A Noosa Shire Council mapping
                 address appropriate to the intended use.       Buildings incorporate appropriate screening to ensure that    indicates that the development is
                                                                any under-storey is not visible from the street, where such   outside flood effected areas.
                                                                screening does not impede flood water flows.
                                                                AO6.3                                                         N/A Noosa Shire Council mapping
                                                                Residential buildings minimise risk from flooding by          indicates that the development is
                                                                providing parking and other low intensive, non-habitable      outside flood effected areas.
                                                                uses at ground level, rather than habitable uses.
                                                                AO6.4                                                         N/A Noosa Shire Council mapping
                                                                Non-residential buildings and structures are oriented to      indicates that the development is
                                                                the street by activating the street frontage with             outside flood effected areas.
                                                                appropriate uses and urban design treatments such as
                                                                recessed wall treatments, screening or landscaping, whilst
                                                                allowing for flow through of flood waters on the ground
                                                                floor.
                                                                AO6.5                                                         N/A Noosa Shire Council mapping
                                                                Basements and underground car parking areas are               indicates that the development is
                                                                designed to drain and function safely during a flood event    outside flood effected areas.
                                                                and power failure.
 PO7                                                            AO7.1                                                         To be complied with at detailed
 Water quality treatment systems use natural processes and      Water quality treatment systems are designed to be
 materials, whenever possible, and are integrated into                                                                        design / construction stages.
                                                                integrated into the landscape consistent with the technical
 development to enhance biodiversity and landscape benefits.
                                                                design guideline published by Healthy Land and Water
                                                                Water by Design for the feature. (eg. For Bioretention
                                                                Basins: Bioretention Technical Design Guidelines (October




Page 5 of 9
June 2021

Page 34

Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                          COMMENTS
                                                              2014) and for Wetland Systems the Wetland Technical
                                                              Design Guideline (May 2017).

 Essential network infrastructure                             AO8                                                          N/A Noosa Shire Council mapping
 PO8                                                          Essential network infrastructure that is likely to fail to   indicates that the development is
 Essential network infrastructure maintains effective         function or may result in contamination when inundated       outside flood effected areas.
 function during and immediately after flood and storm tide   by flood water (e.g. water supply pipeline air valves and
 inundation events.                                           the like) is located above the DFE level (or where
                                                              the DFE has not been modelled for the area, above the
                                                              highest recorded flood level for the area).




 Essential community infrastructure                           AO9.1                                                        N/A Noosa Shire Council mapping
 PO9                                                          Essential community infrastructure is sited and              indicates that the development is
 Essential community infrastructure is able to function       constructed to ensure that flood levels comply with flood    outside flood effected areas.
 effectively during and immediately after flood events.       immunity requirements specified in Table 8.2.6.4.




Page 6 of 9
June 2021

Page 35

Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                           ACCEPTABLE OUTCOMES                                         COMMENTS
                                                AO9.2                                                       N/A no essential community
                                                Essential community infrastructure which is located below   infrastructure is proposed as part
                                                the specified flood immunity requirements:                  of the development.

                                                        1. is designed and constructed to function
                                                           effectively during and immediately after
                                                           the recommended flood level event; and
                                                        2. has direct access to low hazard evacuation
                                                           routes or an emergency rescue area above
                                                           the PMF, if it is for emergency
                                                           services (including emergency shelters,
                                                           police facilities, hospitals and associated
                                                           facilities).




Page 7 of 9
June 2021

Page 36

Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions



 Earthworks                                                          AO10                                                      To be complied with at detailed
 PO10                                                                Filling, other than accessways:
 Excavation and filling for operational works only occur                                                                       design / construction stages.
 where they:                                                                  1. does not extend more than the equivalent of
                                                                                 3 metres around the main building, measured
              1. result in the protection, rehabilitation and                    from the outer walls of the building;
                 repair of ecologically important areas,                      2. is limited to a maximum of 500m2 and
                 watercourses, drainage lines and wetlands;                   3. does not impact on the local drainage of
              2. do not adversely impact on the overall                          adjoining properties.
                 hydrology, hydraulics and flood capacity of
                 a waterway;
              3. do not directly, indirectly or cumulatively cause
                 adverse impacts external to the site;
              4. do not cause increased flooding, which
                 adversely affects the safety or use of any land
                 upstream or downstream;
              5. do not cause ponding of water on the site or
                 nearby land;
              6. do not result in a reduction in flood storage
                 capacity;
              7. do not adversely affect the flow of water in any
                 overland flow path; and
              8. do not adversely affect the privacy or visual
                 amenity of surrounding property.




Page 8 of 9
June 2021

Page 37

Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                       ACCEPTABLE OUTCOMES                                           COMMENTS
 Hazardous materials                                        AO11.1                                                        To be complied with at detailed
 PO11                                                       Materials manufactured or stored on site are not
 Development ensures that public safety and the                                                                           design / construction stages.
                                                            hazardous or noxious, or do not comprise materials that
 environment are not adversely affected by avoiding the     may cause a detrimental effect on the environment if
 release of hazardous materials into flood waters and the   discharged in a flood event.
 environment.
                                                            OR
                                                            AO11.2                                                        N/A no essential community
                                                            If a DFE is adopted, structures used for the manufacture or   infrastructure is proposed as part
                                                            storage of hazardous material are located above               of the development.
                                                            the DFE level.




Page 9 of 9
June 2021

Page 38

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                      COMMENTS
 Stormwater drainage design                                        AO1
 PO1                                                               A stormwater management plan is prepared consistent      Refer to Stormwater Management
 The development and its stormwater management system is           with PSP6 Engineering Design Standards - Roads,          Plan, in specific stormwater quality
 planned and designed having regard to:                            drainage and earthworks.                                 and quantity section prepared by
     1. the natural features of the site;
                                                                                                                            this office.
     2. the need to avoid impacts and potential risks
        to ecologically important areas;
     3. the likely effectiveness of erosion and sediment
        control and stormwater drainage measures during
        rainfall events during and post construction; and
     4. the need to protect environmental values and water
        quality of receiving waters both during and post
        construction.
 PO2                                                               AO2.1                                                    To be complied with at detailed
 Stormwater drainage infrastructure is planned, designed and       Stormwater drainage planning, design and construction    design / construction stages in
 constructed to:                                                   is in accordance with PSP6 Engineering Design            conjunction with the Stormwater
                                                                   Standards - Roads, drainage and earthworks and the       Management Plan, prepared by
               1. incorporate allowance for increased flood risk   latest version of the Queensland Urban Drainage Design
                  and tidal inundation through pipework as a                                                                this office.
                                                                   Manual.
                  result of cilmate change and sea level rise;     AO2.2                                                    Stormwater drainage systems
               2. ensure the development is adequately drained;    The stormwater drainage system connects to a lawful      connects into an existing drainage
                  and                                              point of discharge in accordance with PSP6 Engineering   covenant, consistent with the
               3. ensure stormwater is managed and lawfully        Design Standards - Roads, drainage and earthworks.
                  discharged without altering stormwater                                                                    original subdivision stormwater
                  drainage characteristics external to the site.                                                            plans prepared Barlow Shelly
                                                                                                                            Consulting engineers.




Page 1 of 11
June 2021

Page 39

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                       ACCEPTABLE OUTCOMES                                            COMMENTS
                                                             AO2.3                                                         Development will comply, refer to
                                                             Stormwater flows discharging from the development are         Stormwater Management Plan, in
                                                             demonstrated to be consistent with pre-development            specific stormwater quantity
                                                             characteristics.                                              section prepared by this office.
                                                             AO2.4                                                         Development will comply, refer to
                                                             Development provides for the management of                    Stormwater Management Plan
                                                             stormwater to incorporate appropriate allowance for           prepared by this office.
                                                             climate change impacts (including rainfall intensity and
                                                             sea level rise), in accordance in accordance with PSP6
                                                             Engineering Design Standards – Roads, Drainage and
                                                             Earthworks.
 PO3                                                        AO3.1                                                          Development will comply, existing
 Stormwater drainage infrastructure conveys run-off in a    Stormwater drainage infrastructure meets the desired           stormwater drainage infrastructure
 manner that allows roads to deliver desired standards of   standards of service for roads functionality set out in PSP6   considered in SBSMP won’t be
 service appropriate to the local conditions and local      Engineering Design Standards - Roads, Drainage and
 stormwater drainage characteristics.                                                                                      negatively impacted by the
                                                            Earthworks.
                                                                                                                           development.




 PO4                                                        AO4.1                                                          To be complied with at detailed
 Stormwater infrastructure is compatible with existing      The location, design and construction of stormwater            design / construction stages
 infrastructure, allows for easy access for the ongoing     drainage structures is in accordance with PSP6 Engineering




Page 2 of 11
June 2021

Page 40

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                            COMMENTS
 maintenance by Council, is cost effective across its design    Design Standards - Roads, drainage and earthworks.
 life.

                                                                AO4.2                                                          Development will comply,
                                                                Where infrastructure is located on private land an easement    stormwater Covent is dedicated
                                                                is dedicated over the infrastructure in accordance with PSP6   over the proposed point of
                                                                Engineering Design Standards - Roads, drainage and             discharge consistent with the
                                                                earthworks.                                                    original subdivision approval.
                                                                AO4.3                                                          To be complied with at detailed
                                                                Any alterations or repairs to infrastructure as a result of    design / construction stages
                                                                the development are made at no cost to Council.

                                                                AO4.4                                                          Development complies.
                                                                Development avoids stormwater inflow and infiltration to
                                                                the sewer infrastructure network.
                                                                AO4.5                                                          Development will comply,
                                                                Stormwater infrastructure is designed to minimize              stormwater covenant provides
                                                                maintenance costs and the requirement for specialized          sufficient access for maintenance
                                                                equipment for maintenance techniques.                          purposes.
 PO5                                                            AO5.1                                                          Development will comply, Noosa
 Stormwater drainage infrastructure is aligned to avoid         Stormwater drainage infrastructure avoids crossing             Shire Council interactive mapping
 crossing waterways, wetlands, drainage lines and               waterways, wetlands drainage lines and ecologically            indicates that no waterways,
 ecological important areas, or where it is demonstrated this
                                                                important areas or follows the edge of existing disturbed      wetlands drainage lines
 is unavoidable, disturbed areas are reinstated and
 revegetated upon completion of works.                          areas.                                                         and ecologically important areas
                                                                                                                               are located within the development
                                                                                                                               area.




Page 3 of 11
June 2021

Page 41

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                          ACCEPTABLE OUTCOMES                                           COMMENTS
                                                               AO5.2                                                         N/A
                                                               Stormwater drainage infrastructure is co-located with
                                                               other infrastructure within a combined utility corridor
                                                               where appropriate.
                                                               AO5.3                                                         N/A
                                                               Temporary vehicular crossings of waterways must be
                                                               designed and constructed to be consistent with the
                                                               current International Erosion Control Association Best
                                                               Practice Book Series.
 Stormwater quality and protection of receiving waters         AO6.1                                                         Noosa Shire Council interactive
 PO6                                                           Stormwater runoff discharging into High Ecological Value      mapping indicates that no High
 Development is located, designed, constructed and operated    waters as a result of development causes no increase in       Ecological Value waters are
 to protect and enhance environmental values and water
                                                               gross pollutants, total suspended solids, total phosphorous   located within the development
 quality of waterways, wetlands, lakes, ground waters and
 drainage systems.                                             or total nitrogen compared to a pre-development scenario.     site.

                                                               AND                                                           Development will comply, Refer to
 Editor’s note: Environmental values of waters and water                                                                     Stormwater Management Plan, in
                                                               AO6.2
 quality objectives are prescribed in Schedule 1 of the                                                                      specific stormwater quality section
                                                               All stormwater runoff is treated to achieve maximum
 Environmental Protection (Water) Policy 2009 and are                                                                        prepared by this office.
 identified on the State Planning Policy Interactive Mapping   removal of nutrients, gross pollutants and suspended
 System.                                                       solids as determined by cost to efficiency ratios. (e.g.
                                                               bioretention basins must be sized to achieve at least 80%
                                                               reduction in total suspended solids, 60% reduction in total
                                                               phosphorous, 45% reduction in total nitrogen and 90%
                                                               reduction in gross pollutants >5mm).




Page 4 of 11
June 2021

Page 42

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                           COMMENTS
                                                                OR                                                            To be complied with at detailed
                                                                                                                              design / construction stages.
                                                                AO6.3
                                                                Developments achieve a minimum 3 drop rating consistent
                                                                with the Water by Design Living Waterways Scoring Guide
                                                                (Healthy Land and Water).
 PO7                                                            AO7.1                                                         Development will comply, Refer to
 Water quality treatment systems use natural processes and      Water quality treatment systems are designed to be
 materials, whenever possible, and are integrated into                                                                        Stormwater Management Plan, in
                                                                integrated into the landscape consistent with the technical
 development to enhance biodiversity and landscape benefits.                                                                  specific stormwater quality section
                                                                design guideline published by Healthy Land and Water
                                                                Water by Design for the feature. (eg. For Bioretention        prepared by this office.
                                                                Basins: Bioretention Technical Design Guidelines (October
                                                                2014) and for Wetland Systems the Wetland Technical
                                                                Design Guideline (May 2017).

 PO8                                                            AO8.1                                                          N/A water quality treatment
 Water quality treatment infrastructure to be dedicated as      Detailed life cycle costing is provided for the entire         infrastructure will not be dedicated
 public assets are proven to be suitable for its use and of a   treatment train system including replacement costs of          to Council.
 cost effective and efficient standard.
                                                                asset parts.
                                                                AO8.2
                                                                Treatment systems dedicated as public assets are designed
                                                                to minimize maintenance, renewal and adaption costs and
                                                                the requirement for specialized equipment, material or
                                                                maintenance techniques
                                                                AO8.3
                                                                Vegetated stormwater management systems to be
                                                                dedicated as public assets are established and maintained




Page 5 of 11
June 2021

Page 43

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                        ACCEPTABLE OUTCOMES                                            COMMENTS
                                                             during the maintenance period to ensure optimal
                                                             vegetated growth and that the functional elements of the
                                                             system achieve the design function at the end of the
                                                             maintenance period.

 PO9                                                         AO9.1                                                          To be complied with at detailed
 Treatment systems are designed to eliminate or minimise     Free draining inlets and outlets are provided to ensure that   design / construction stages.
 health, safety and aesthetic hazards, including risks
 associated with insect breeding, odour and public safety.   waters do not pond for more than 24 hours.
                                                             AO9.2                                                          To be complied with at detailed
                                                             Developments are designed to eliminate retaining walls in      design / construction stages.
                                                             excess of 0.8m for any water quality treatment device.
                                                             AO10
 Hydrology and waterway stability                                                                                      Development will comply, Refer to
 PO10                                                        The development is designed to:                           Stormwater Management Plan,
 Development prevents increased bed and bank erosion and             1. limit the peak 1 year ARI event discharge
 sedimentation in receiving waterways by avoiding changes                                                              specifically ADG sketch plan.
                                                                        within the receiving waterway to the pre-
 in low rate, peak flow run-off and flow duration.
                                                                        development peak 1 year discharge;
                                                                     2. maximise pervious areas by using pervious
                                                                        alternatives for otherwise impervious areas
                                                                        wherever possible;
                                                                     3. provide for capture and reuse of stormwater
                                                                        for non-potable purposes for gardening, toilet
                                                                        flushing, laundry and hot water supply uses;
                                                                     4. incorporate appropriate detention features;
                                                                        and
                                                                     5. incorporate natural channel design principles




Page 6 of 11
June 2021

Page 44

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                             ACCEPTABLE OUTCOMES                                           COMMENTS




 PO11                                                             AO11.1
                                                                                                                                N/A Natural channel (gully) already
 Water sensitive urban design principles are applied to           The design and construction of a natural channel or natural
 achieve multifunctional design of waterways, wetlands and                                                                      exists no new channels natural
                                                                  channel rehabilitation works are in accordance with the
 drainage lines that provide for:                                 Natural Channel Design Guidelines (Brisbane City              channel or natural channel
          1. stormwater conveyance that uses natural                                                                            rehabilitation works are proposed.
              channel design;
                                                                  Council) having regard to local topography, geology and
          2. protection of landscape features and ecological      geomorphology.
              important areas including terrestrial and aquatic   AO11.2                                                        To be complied with at detailed
              habitat;                                            Landscape features, plant species and habitat types used      design / construction stages.
          3. aesthetic and passive recreation values;             in stormwater conveyance channels are complementary to
          4. flood management and conveyance of external          the local context and natural waterways.
              catchment stormwater through the                    AO11.3                                                        To be complied with at detailed
              development;                                        Bank and bed stability and planting densities result in a     design / construction stages.
          5. landscaping that incorporates local native           stable channel over the long term and minimal potential
              species; and                                        for pest plant species.
          6. bed and bank stability.                              AO11.4
                                                                                                                                Development Complies, Water
                                                                  Water Sensitive Design measures are incorporated into the
                                                                                                                                Sensitive Design measures were
                                                                  development, as detailed in the document Water Sensitive
                                                                  Designs small improvements, new ideas, concepts and           incorporated in the SBSMP.
                                                                  sketch designs for stormwater filtration systems (Healthy
                                                                  Waterways Water by Design).
                                                                  AO11.5
                                                                                                                                N/A Noosa Shire Council mapping
                                                                  Floodplain management is designed in accordance with
                                                                                                                                indicates that no flood plains are
                                                                  the Framework for the Integration of Flood




Page 7 of 11
June 2021

Page 45

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                    ACCEPTABLE OUTCOMES                                           COMMENTS
                                                         and Stormwater Management into Open Space published           located within the development
                                                         by Healthy Waterways Water by Design (version current at      area.
                                                         the time of development application).
 PO12                                                    AO12.1                                                        Development will comply, pre-
 Development protects in-stream ecology by maintaining   Where run-off from or within the site passes through or       development low flows will be
 pre-development low flow discharge regimes and          drains to natural channels, waterways or wetlands,            maintained in accordance with the
 maintaining fish passages.                              development protects in-steam ecology by maintaining
                                                                                                                       frequent flow management
                                                         pre-development low flow discharge regimes in
                                                                                                                       objectives in PSP6 Engineering
                                                         accordance with the frequent flow management objectives
                                                         in PSP6 Engineering Design Standards - Roads, drainage        Design Standards - Roads,
                                                         and earthworks                                                drainage and earthworks
                                                         AO12.2                                                        N/A no instream structure are
                                                         Instream structures such as roads, bridges, culverts, and     proposed within this SBSMP
                                                         other stormwater infrastructure do not cause barriers to      prepared by this office.
                                                         fish passage and facilitate the movement of terrestrial and
                                                         aquatic fauna along waterway corridors.
                                                         AO12.3                                                        Development will comply.
                                                         Benthic substrate retains a continuous grade with the
                                                         direction of flow consistent with the natural bed profile.
 PO13                                                    AO13.1                                                        To be complied with at detailed
 Development is designed and constructed to maintain     The location and form of stormwater discharge points do       design / construction stages.
 surface and ground water balances that sustain the      not alter the pre-development hydrology of receiving
 environmental values of water dependent ecosystems,     surface water or groundwater.




Page 8 of 11
June 2021

Page 46

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                       ACCEPTABLE OUTCOMES                                       COMMENTS
 including downstream aquatic, riparian, wetland and        AO13.2                                                     N/A Development is not located
 terrestrial ecosystems.                                    Developments located on groundwater recharge or            located on groundwater recharge
                                                            discharge areas are designed and managed in accordance     or discharge areas.
                                                            with a groundwater recharge and discharge management
                                                            plan prepared by a suitably experienced and qualified
                                                            groundwater hydrologist. The groundwater recharge or
                                                            discharge must demonstrate that the development does
                                                            not affect groundwater balances beyond the property
                                                            boundaries.
 Construction and establishment of stormwater               AO14.1                                                    To be complied with at detailed
 management systems                                         An erosion and sediment control plan prepared in          design / construction stages.
 PO14                                                       accordance with the International Erosion Control
 Construction methods provide for appropriate controls to   Association Best Practice Books demonstrates that the
 avoid entry and transport of litter, sediment, and         capture and release of stormwater achieves the design
 associated prescribed water contaminants into receiving    objectives listed in Table A: Construction phase –
 waters.                                                    stormwater management design objectives of the State
                                                            Planning Policy (Appendix 2).

                                                            AO14.2                                                    To be complied with at detailed
                                                            Construction works are designed and managed to restrict   design / construction stages.
                                                            the extent of clearing and soil exposure to the minimum
                                                            necessary for access, and safe construction at any one
                                                            time.
                                                            AO14.3                                                     To be complied with at detailed
                                                            For buildings:                                             design / construction stages.




Page 9 of 11
June 2021

Page 47

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                           ACCEPTABLE OUTCOMES                                           COMMENTS
                                                            1. upstream runoff is diverted around
                                                               the construction site;
                                                            2. sediment barriers are provided
                                                               downslope of disturbed areas to
                                                               prevent sediment washing into
                                                               gutters, drains and waterways ,
                                                               wetlands or drainage lines either on
                                                               or off the site; and
                                                            3. temporary or permanent downpipes
                                                               are connected to the stormwater
                                                               system before laying the roof; or
                                                            4. Localized erosion is avoided by
                                                               directing flow from downpipes over
                                                               non-erosive areas.
                                                AO14.4                                                        To be complied with at detailed
                                                Chemical flocculants used as part of an erosion and           design / construction stages.
                                                sediment control plan do not harm the environmental
                                                values within receiving waters.
                                                AO14.5                                                        To be complied with at detailed
                                                Appropriately sized litter containment areas, with            design / construction stages.
                                                provision for sorting recyclables are provided for the type
                                                of litter expected to be generated onsite.




Page 10 of 11
June 2021

Page 48

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                   ACCEPTABLE OUTCOMES                                          COMMENTS
                                                        AO15
 Wastewater management and effluent disposal
                                                        Wastewater (non-sewage) generated from the
 PO15
                                                        development is collected and contained on-site, and is:
 Development does not discharge wastewater unless it
 can be demonstrated to not compromise environmental
                                                                 1. lawfully disposed to sewer; or
 values of waters and water quality objectives
                                                                 2. transferred off-site for treatment/disposal to
                                                                    an appropriately licenced facility;
                                                                 3. reused on-site in a closed-cycle irrigation
                                                                    scheme, industrial processes, washing or
                                                                    cleaning or other purpose; or
                                                                 4. treated to meet the drinking water supply
                                                                    environmental values prior to release.
 PO16                                                   AO16
 On-site effluent treatment and disposal systems are    An onsite effluent system and disposal area is:
 designed, constructed and managed to not compromise
 the environmental values of waters and water quality            1. not located on a slope greater than 1 in
 objectives.                                                        (10%);
                                                                 2. not located at or below the 1% annual
                                                                    exceedance probability (AEP flood event);
                                                                 3. not located within a riparian buffer
                                                                    area mapped on a Biodiversity, Waterways
                                                                    and Wetlands Overlay Map; and
                                                                 4. setback 400 metres minimum from the full
                                                                    supply level of Lake Macdonald.




Page 11 of 11
June 2021

Page 49

                                                                               Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                 August 2021




                                                                 Appendix E
                                              NSC Erosion Hazard Assessment




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Page 50

        SCHEDULE 2—EROSION AND SEDIMENT CONTROL




                                                                                                                   Proposed Amendments August 2015
                     ASSESSMENT




                                                                                                  The Noosa Plan
1.            Preamble

Erosion and sediment control on building sites

Builders must not pollute the environment. The Environmental Protection Act provides for
penalties for persons or entities causing environmental harm.

Soil erosion on building sites can be a major source of sediment pollution (environmental
harm) in our watercourses. A single building site can lose up to four truckloads of soil in one
storm. Washed from the sites into stormwater drains, this sediment can cause flooding and
also affects the water quality and the fish stocks in our creeks, lakes and the Noosa River
system.

Preventing sediment run-off from building sites is one of a number of ways that Council and
industry are improving our watercourses.

Effective on-site erosion and sediment control provides the following benefits—


      A better looking, more marketable site;
      Improved wet weather working conditions;
      Reduced stockpile losses;
      Less mud and dust problems;
      Reduced clean-up costs;
      Fewer public complaints;
      Better public image;
      Cleaner watercourses; and
      Better fishing and swimming in our nearby watercourses.

2.            Erosion Hazard Assessment Form
Controlling Factors                                                   Points   Score   Checking
Predominant slope1 of the whole site, prior to
building works:
 0 - 3% slope                                                           0
 >3% - 5% slope                                                         1        1
 >5% - 10% slope                                                        2
 >10% - 15% slope                                                       4
 > 15% slope                                                            5
Soil type: (see 1 below)
 Sandy soil/gravel                                                      0       2
 Sandy loam                                                             1

1
    The term ‘predominant slope’ is defined in Part 2 Section 2.12.



                                                              S2.1

Page 51

                                                   Controlling Factors                                                 Points         Score         Checking
                                                    Clay loam                                                             2
                 Proposed Amendments August 2015




                                                    Clay soil                                                             2
The Noosa Plan




                                                   Anticipated duration of site disturbance: (see 2 below)
                                                    Duration < 2 weeks                                                      0
                                                    2 weeks  Duration < 3 months                                           2            2
                                                    3 months  Duration < 6 months                                          4
                                                    Duration > 6 months                                                     5
                                                   Month that works are undertaken: (see 3 below)
                                                    August, September                                                       0
                                                    April, May, June, July, November, October                               1            1
                                                    March December                                                          2
                                                    January February                                                        3
                                                   Offsite sediment control (i.e. down slope of the soil
                                                   disturbance):
                                                    Score 1 point if there is no purpose built, operational                 1
                                                       and well maintained sediment traps (eg. sediment
                                                       basin, gross pollutant trap or purpose built wetland)
                                                                                                                                           1
                                                       to catch sediment before it enters a water body with
                                                       environmental values (eg. creek, natural wetland,
                                                       river or bay) (see 4 below)
                                                   Run-off entering the site:
                                                    Score 1 point if stormwater run off entering the site is                1             0
                                                       not diverted away from the soil disturbance
                                                   Extent of site disturbance:
                                                    Score 2 points if building work requires reshaping of
                                                       the ground surface (eg. ‘cut and fill’ works) (see 5                  2             2
                                                       below)
                                                     Score 5 points if the area to be disturbed is greater                  5
                                                      than 600m²
                                                   Works within environmentally sensitive areas:
                                                    Score 11 points if the disturbance is within the banks
                                                      of a watercourse (see 6 below)                                        11
                                                    Score 5 points if the disturbance is within 50m of the                                2
                                                      top of bank of a watercourse                                           5
                                                    Score 2 points if the disturbance is between 50m
                                                      and 100m of the top of bank of a watercourse                           2

                                                                                                                                          11             LOW
                                                   TOTAL SCORE (See 7 & 8 below)
                                                   Notes:
                                                       1. Where there is more than one type of soil on the site, select the category with the highest point value.
                                                       2. The time, from when the building site will first become vulnerable to erosion, to the time the soil will
                                                          be fully stabilised (eg. grassing).
                                                       3. If this time span covers more than one category, select the category with the highest point value.
                                                          Note that if there is no grass/vegetation cover on the site before building work has started, the time
                                                          span starts from the time this form is completed.
                                                       4. If you are not sure, score 1 point.
                                                       5. For the purpose of this form, ‘cut and fill’ works are those that will result in a steep batter or retaining
                                                          wall above and/or below the building slab, greater than 1 metre in height. If the building slab has
                                                          already been fully cut and stabilised (eg. grassed) during the subdivision stage, score 0 points.
                                                       6. Watercourse means any clearly identifiable creek, stream or river, whether flowing permanently or
                                                          intermittently.
                                                       7. For a high risk site, the total score is  14 points.
                                                       8. For a low risk site, the total score is < 14 points.




                                                                                                            S2.2

Page 52

3.        Erosion and Sediment Control Methods




                                                                                                                  Proposed Amendments August 2015
                                                                                                 The Noosa Plan
                    Element                                    Solution

Minimise disturbance when excavating      Retain as much grassed area as possible on the
                                          site.
                                          These areas not only improve the appearance
                                          of the site they also filter much of the sediment
                                          from stormwater run-off before it reaches the
                                          drainage system.
Catch drains and perimeter banks          Allow for diversion of up slope stormwater
                                          around the work site and other disturbed
                                          surfaces.
Install a sediment barrier                Install sediment barriers down slope of the
                                          building site to filter coarse sediment before it
                                          can wash into gutters, drains and watercourses.
                                           Purpose designed geotextile sediment
                                               fabric (i.e. not shadecloth) attached to posts
                                               with the geotextile buried in an upstream
                                               trench; or
                                           Place turf of a minimum 600mm width along
                                               kerb line; or
                                           Straw bales, staked in a 100mm (min) deep
                                               trench.
Single gravelled entry-exit               Restrict vehicle access to one entry-exit point.
                                           Gravelling the access point will allow all
                                               weather access, will reduce the amount of
                                               soil carried off the site by vehicles, and will
                                               provide a permanent base for the driveway.
Early stormwater drainage connection      Connect a temporary or permanent downpipe/s
                                          to the stormwater system before laying the roof
                                          or slow and spread the flow from downpipe/s to
                                          avoid localised erosion. Downpipe/s may be
                                          temporarily removed during wall construction.
                                          All stormwater must discharge in a manner that
                                          does not cause soil erosion.
Concrete waste and washing                Waste concrete and household paint must not
                                          be allowed to wash into the gutters or the street.
Sand and soil stockpiles                  Stockpiles must be placed wholly on the
                                          construction site and behind a sediment barrier.




                                       S2.3

Page 53

                                                                               Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                 August 2021




                                                        Appendix F
                    Noosa Shire Council Maps (Interactive Mapping)




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Page 54

Noosa Shire Council does not warrant the accuracy of
information in this publication and any person using or         23/06/2021
relying upon such information does so on the basis that
Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in       1:4514
the information.

Page 55

Noosa Shire Council does not warrant the accuracy of
information in this publication and any person using or         23/06/2021
relying upon such information does so on the basis that
Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in       1:4514
the information.

Page 56

Noosa Shire Council does not warrant the accuracy of
information in this publication and any person using or         23/06/2021
relying upon such information does so on the basis that
Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in       1:5000
the information.

Page 57

Noosa Shire Council does not warrant the accuracy of
information in this publication and any person using or         23/06/2021
relying upon such information does so on the basis that
Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in       1:4514
the information.

Page 58

gZ Base

 

Froduction Strasp

 

 

Road Labels
Major
Az_ Intermediate
Az Minor
g Contours
Az_ Contour Labels
/\/ Contours (1m)
/\/ Land Parcels

/\/ Roads
/V

/\/ Council
WN/ Main Roads

/\/ National Park
Private
/N/ State Forest
/\/ Sunshine Coast Council
/N/ Road Ownership

SN/ Council
/\/ Main Roads

/\/ Private
/\/ Private - Council Owned
Private - Other Authority
/\/ State Forest
Easement
Covenant
MM «Open Space
Mi = NATIONAL PARK
"STATE FOREST
Ml STATE MANAGED RESERVES
Ml ENVIRONMENT
- RECREATION PARK
1) SPORTS & ACTIVE RECREATION
(9) CAMPING / CARAVAN PARK
WN/ Locality Boundary
WJ Local Government Areas

WA Noosa

 

 

 

 

Page 59

Noosa Shire Council does not warrant the accuracy of
information in this publication and any person using or         23/06/2021
relying upon such information does so on the basis that
Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in       1:4000
the information.

Page 60

                                                                               Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                 August 2021




                                                                      Appendix G
                                                        XP-Storm Modelling Results




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Page 61

Pre-Development Flows

=
ECN_0.5EY_1_S5hr_9[Max 0.177]
—
ECN_2O0pct_2hr_8[Max 0.139]
SS
ECN_10pct_30min_3[Max 0.190]

=
ECN_5pct_thr_10[Max 0.402]

 

=
ECN_O.5EY_2hr_8[Max 0.101]

=
ECN_20pct_3hr_3[Max 0.275]
—
ECN_10pct_1 O[Max 0.325]
—

ECN_2pet_12hr_8[Max 0.707]

 

=
ECN_0.5EY_9hr_3[Max 0.174]

x)
ECN_20pct_9hr_3[Max 0.260]

 

=)
ECN_5pct_30min_3[Max 0.258]

ECN_1pct_12hr_8[Max 0.807]

 

 

 

0.8
0.7
0.6
0.5
2
20.4
2
0.3
0.2
0.1
0.0
41 Fri 3AM 6AM 9AM 12PM 3PM 6PM 9PM 2 Sat
Jan 2016 Time
Post-Development Flows (UnMitigated)
= == =a
ECN_0.5EY_1_5hr_9[Max 0.225] ECN_0.5EY_2hr_8[Max 0.282] ECN_0.5EY_9hr_3[Max 0.188]
a | =z x,
ECN_20pct_2hr_8[Max 0.359] ECN_20pct_3hr_3[Max 0.299] ECN_20pct_9hr_3[Max 0.258]
= Ss =
ECN_10pct_30min_3[Max 0.490] ECN_10pcet_thr_10[Max 0.432] ECN_5pct_30min_3[Max 0.578]
== — Lt
ECN_5pct_thr_10[Max 0.516] ECN_2pct_12hr_8[Max 0.712] ECN_1pct_12hr_8[Max 0.812]
0.8
0.7
0.6
0.5
204
0.3
0.2
0.1
0.0

 

 

 

1 Fri 3AM 6AM
Jan 2016

9AM 12PM 3PM
Time

6PM 9PM 2 Sat

Page 62

Post-Development Flows (Mitigated, Free Outlet)




   Storage over 80m2 Bioretention (Mitigated, Free Outlet)




   Storage over 45m2 Bioretention (Mitigated, Free Outlet)

Page 63

Post-Development Flows (Mitigated, Full Open Channel at LPD)




     Storage over 80m2 Bioretention (Mitigated, Full Open Channel at LPD)




     Storage over 45m2 Bioretention (Mitigated, Full Open Channel at LPD)

Page 64

                                                                               Noosa Residential Development
                                                                        Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                 August 2021




                                                                      Appendix H
                                                        Approved Subdivision Plans
                                                         Prepared by Barlow Shelly




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Page 65

ENGINEERING

WATER RETICULATION NETWORK EXTENSION
- UNITYWATER -
PROJECT:

PROPOSED SUBDIVISION AT
NOOSA CIVIC, WALTER HAY DRIVE
NOOSAVILLE
CLIENT:
STOCKWELL PTY LTD
PROJECT No:
1856
            SCHEDULE OF DRAWINGS
 DWG        DESCRIPTION
 1856-W01   Locality Plan & Schedule of Drawings
 1856-W02   General Notes
 1856-W03   Overall Watermain Alignment Layout Plan
 1856-W04   Watermain Layout Plan - Sheet 1 of 8
                                                                                                         SUBJECT SITE
 1856-W05   Watermain Layout Plan - Sheet 2 of 8
 1856-W06   Watermain Layout Plan - Sheet 3 of 8
 1856-W07   Watermain Layout Plan - Sheet 4 of 8
 1856-W08   Watermain Layout Plan - Sheet 5 of 8
 1856-W09   Watermain Layout Plan - Sheet 6 of 8
 1856-W10   Watermain Layout Plan - Sheet 7 of 8
 1856-W11   Watermain Layout Plan - Sheet 8 of 8
 1856-W12   Watermain Connection Detail Plan - Sheet 1 of 5
 1856-W13   Watermain Connection Detail Plan - Sheet 2 of 5
 1856-W14   Watermain Connection Detail Plan - Sheet 3 of 5
 1856-W15   Watermain Connection Detail Plan - Sheet 4 of 5
 1856-W16   Watermain Connection Detail Plan - Sheet 5 of 5
 1856-W17   Typical Trench Details



                                                                            LOCALITY PLAN
                                                                            NOT TO SCALE




DRAWING STATUS:

FOR CONSTRUCTION



                 p 07 5443 8285                                             PROPERTY DESCRIPTION
                 e [email protected] w www.barlowshelley.com.au
                 a PO Box 899, Maroochydore,4558 ABN 89 215 591 077         LOT 3 on SP246584
                                                                            Site Area = 31.7 Ha
                                                                                                                        DRAWING NUMBER
                                                                                                                                         -
                                                                                                                                         REV



                                                                            Proposed Number of Lots 25              1856-W01              C

The text continues on page 66.

Used in these records

About this file

File size
27.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix J - Civil Engineering Report and SBSMP.pdf · 27.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.