Skip to the record
Accept no substitutions.

Original source · versioned page text

Appendix J - Civil Engineering Report and SBSMP

of 86

Page text read automatically using OCR, there may be inaccuracies

                                                                                 Noosa Residential Development
                                                                           Ref: 24553 C R002 REV03 10.08.21.docx
                                                                                                    August 2021


4        PROPOSED DEVELOPMENT
         The proposed development as described in the architectural drawings in Appendix B is a residential
         development comprised of three (3) multi-storey residential buildings.

         A breakdown of the surface areas exposed to rainfall for the proposed development is presented in
         Table 2.

                                  Table 2 – Proposed Development Areas

           Catchment ID       Land Type      % Impervious      Area (m2)    Percentage of Total Site Area

                                 Roof              100           1,677                   16.59%
                B1
          (Catchment to      Landscaping            0            2,654                   26.25%
               rear           Hardstand            100            722                     7.14%
           Bioretention)
                                 Pool              100            53                      0.52%

                                 Roof              100           2,079                   20.57%
                B2
          (Catchment to      Landscaping            0            1,158                   11.46%
               front          Hardstand            100            356                     3.52%
           Bioretention)
                              Driveway             100            615                     6.08%

                B3          Landscaping             0             679                    6.71%
          (Catchment to
              bypass
           Bioretention)      Hardstand            100            116                    1.15%

              TOTAL                                56           10,113                  100.00%

         Refer to the Stormwater Quality Plan SK02 in Appendix C for further information regarding the areas
         calculated for each land type.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                            Page 10

Log in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.