7.2.3 Construction Phase
During the construction phase of the development, there is a risk of sedimentation transport due to
disturbed land. The following erosion and sediment control measure will need to be installed in
addition to the aforementioned measures (Pre-Development and Bulk Earthworks Phases) to ensure
there is minimal disturbance and the quality of runoff is maintained to an acceptable standard:
Construction of temporary diversion drains to divert water to sediment basins;
Construction of temporary diversion drains to divert water to protect bioretention and treatment
devices as required;
Sediment barriers to be installed on all entrances to newly constructed stormwater infrastructure
(i.e. gully pits);
Sediment fences to be installed on the downstream side of any stockpiles and batters; and
Re-vegetation of all disturbed areas within two (2) weeks of completion.
All erosion and sediment control measures are to be designed and installed in accordance with Best
Practice Erosion and Sediment Control" published by International Erosion Control Association
(IECA). Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
7.2.4 Maintenance
All erosion and sediment control devices are to be maintained through the entire phase of the
development leading up to the operational phase. Erosion and sediment control devices will need to
be monitored closely throughout the entire project to ensure they are operating correctly and
efficiently. No erosion and sediment control devices are to be removed unless otherwise authorised
by a suitably qualified engineer or the site superintendent.
7.3 Stormwater Quality Improvement Devices (SQIDs)
A stormwater treatment train has been established to treat the runoff from the proposed development
that includes the developable works area only (impervious carparking and units) and green space
areas. The proposed treatment train will enable a higher level of pollutant removal efficiency by using
stormwater quality improvement devices (SQIDs). Maintenance of the SQIDs will be the
responsibility of the owners of the development. The maintenance should be carried out in
accordance with the Council conditions of approval and Water by Design guidelines, such as Water
by Design guidelines (2009) Maintaining Vegetated Stormwater Assets.
7.4 Operational Phase Treatment
Once directed to be commissioned by the superintendent and engineers, the Stormwater Quality
Improvement Devices (SQIDs) will provide the required level of stormwater quality treatment to runoff
from the site prior to discharging into stormwater covenant and ultimately Council’s stormwater
drainage infrastructure. It is expected that sediment laden runoff and the erosion potential at the
subject site during the operational phase will be minimal. This is due to impervious developed areas
in the form of roofs, driveways and carparking. It is understood that the footprint of these impervious
areas has been reduced as much as practicable. The proposed landscaped areas will be maintained
in a manner that will minimise erosion.
Existing grassed and proposed landscaped areas will be maintained in a manner that will minimise
erosion, some of which would be subject to erosion of topsoil from garden beds, erosion of soil from
steep batters, etc.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 17
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.