Original source · versioned page text
Appendix J - Civil Engineering Report and SBSMP
Noosa Residential Development
Ref: 24553 C R002 REV03 10.08.21.docx
August 2021
Figure 4 - Treatment train Layout and Results
7.6 On-site Treatment Lifecycle Costs
A lifecycle cost analysis is not a part of the scope of this report. All the recommended water quality
treatment infrastructure lies within the development site and it shall be maintained and serviced by
the owners of the development at no cost to Council.
7.7 Water Quality Monitoring
No water quality monitoring is proposed for this development at this stage due to the nature of the
development and the expected pollutant levels.
7.8 Maintenance
Maintenance of the SQIDs will be the responsibility of the owners of the development. The
maintenance should be carried out in accordance with the manufacturer’s recommendations, Council
conditions of approval and in accordance with the Water by Design (2009) Maintaining Vegetated
Stormwater Assets guideline.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 19
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.