Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix J - Civil Engineering Report and SBSMP

of 86

Page text read automatically using OCR, there may be inaccuracies

Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                          COMMENTS
                                                              2014) and for Wetland Systems the Wetland Technical
                                                              Design Guideline (May 2017).

 Essential network infrastructure                             AO8                                                          N/A Noosa Shire Council mapping
 PO8                                                          Essential network infrastructure that is likely to fail to   indicates that the development is
 Essential network infrastructure maintains effective         function or may result in contamination when inundated       outside flood effected areas.
 function during and immediately after flood and storm tide   by flood water (e.g. water supply pipeline air valves and
 inundation events.                                           the like) is located above the DFE level (or where
                                                              the DFE has not been modelled for the area, above the
                                                              highest recorded flood level for the area).




 Essential community infrastructure                           AO9.1                                                        N/A Noosa Shire Council mapping
 PO9                                                          Essential community infrastructure is sited and              indicates that the development is
 Essential community infrastructure is able to function       constructed to ensure that flood levels comply with flood    outside flood effected areas.
 effectively during and immediately after flood events.       immunity requirements specified in Table 8.2.6.4.




Page 6 of 9
June 2021

Log in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.