Original source · versioned page text
Appendix J - Civil Engineering Report and SBSMP
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO9.2 N/A no essential community
Essential community infrastructure which is located below infrastructure is proposed as part
the specified flood immunity requirements: of the development.
1. is designed and constructed to function
effectively during and immediately after
the recommended flood level event; and
2. has direct access to low hazard evacuation
routes or an emergency rescue area above
the PMF, if it is for emergency
services (including emergency shelters,
police facilities, hospitals and associated
facilities).
Page 7 of 9
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.