Original source · versioned page text
Appendix J - Civil Engineering Report and SBSMP
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
Earthworks AO10 To be complied with at detailed
PO10 Filling, other than accessways:
Excavation and filling for operational works only occur design / construction stages.
where they: 1. does not extend more than the equivalent of
3 metres around the main building, measured
1. result in the protection, rehabilitation and from the outer walls of the building;
repair of ecologically important areas, 2. is limited to a maximum of 500m2 and
watercourses, drainage lines and wetlands; 3. does not impact on the local drainage of
2. do not adversely impact on the overall adjoining properties.
hydrology, hydraulics and flood capacity of
a waterway;
3. do not directly, indirectly or cumulatively cause
adverse impacts external to the site;
4. do not cause increased flooding, which
adversely affects the safety or use of any land
upstream or downstream;
5. do not cause ponding of water on the site or
nearby land;
6. do not result in a reduction in flood storage
capacity;
7. do not adversely affect the flow of water in any
overland flow path; and
8. do not adversely affect the privacy or visual
amenity of surrounding property.
Page 8 of 9
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.