Appendix J - Civil Engineering Report and SBSMP
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
Stormwater drainage design AO1
PO1 A stormwater management plan is prepared consistent Refer to Stormwater Management
The development and its stormwater management system is with PSP6 Engineering Design Standards - Roads, Plan, in specific stormwater quality
planned and designed having regard to: drainage and earthworks. and quantity section prepared by
1. the natural features of the site;
this office.
2. the need to avoid impacts and potential risks
to ecologically important areas;
3. the likely effectiveness of erosion and sediment
control and stormwater drainage measures during
rainfall events during and post construction; and
4. the need to protect environmental values and water
quality of receiving waters both during and post
construction.
PO2 AO2.1 To be complied with at detailed
Stormwater drainage infrastructure is planned, designed and Stormwater drainage planning, design and construction design / construction stages in
constructed to: is in accordance with PSP6 Engineering Design conjunction with the Stormwater
Standards - Roads, drainage and earthworks and the Management Plan, prepared by
1. incorporate allowance for increased flood risk latest version of the Queensland Urban Drainage Design
and tidal inundation through pipework as a this office.
Manual.
result of cilmate change and sea level rise; AO2.2 Stormwater drainage systems
2. ensure the development is adequately drained; The stormwater drainage system connects to a lawful connects into an existing drainage
and point of discharge in accordance with PSP6 Engineering covenant, consistent with the
3. ensure stormwater is managed and lawfully Design Standards - Roads, drainage and earthworks.
discharged without altering stormwater original subdivision stormwater
drainage characteristics external to the site. plans prepared Barlow Shelly
Consulting engineers.
Page 1 of 11
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.