Skip to the record
Accept no imitations.

Original source · versioned page text

Appendix J - Civil Engineering Report and SBSMP

of 86

Page text read automatically using OCR, there may be inaccuracies

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                       ACCEPTABLE OUTCOMES                                            COMMENTS
                                                             AO2.3                                                         Development will comply, refer to
                                                             Stormwater flows discharging from the development are         Stormwater Management Plan, in
                                                             demonstrated to be consistent with pre-development            specific stormwater quantity
                                                             characteristics.                                              section prepared by this office.
                                                             AO2.4                                                         Development will comply, refer to
                                                             Development provides for the management of                    Stormwater Management Plan
                                                             stormwater to incorporate appropriate allowance for           prepared by this office.
                                                             climate change impacts (including rainfall intensity and
                                                             sea level rise), in accordance in accordance with PSP6
                                                             Engineering Design Standards – Roads, Drainage and
                                                             Earthworks.
 PO3                                                        AO3.1                                                          Development will comply, existing
 Stormwater drainage infrastructure conveys run-off in a    Stormwater drainage infrastructure meets the desired           stormwater drainage infrastructure
 manner that allows roads to deliver desired standards of   standards of service for roads functionality set out in PSP6   considered in SBSMP won’t be
 service appropriate to the local conditions and local      Engineering Design Standards - Roads, Drainage and
 stormwater drainage characteristics.                                                                                      negatively impacted by the
                                                            Earthworks.
                                                                                                                           development.




 PO4                                                        AO4.1                                                          To be complied with at detailed
 Stormwater infrastructure is compatible with existing      The location, design and construction of stormwater            design / construction stages
 infrastructure, allows for easy access for the ongoing     drainage structures is in accordance with PSP6 Engineering




Page 2 of 11
June 2021

Log in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.