Appendix J - Civil Engineering Report and SBSMP
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO5.2 N/A
Stormwater drainage infrastructure is co-located with
other infrastructure within a combined utility corridor
where appropriate.
AO5.3 N/A
Temporary vehicular crossings of waterways must be
designed and constructed to be consistent with the
current International Erosion Control Association Best
Practice Book Series.
Stormwater quality and protection of receiving waters AO6.1 Noosa Shire Council interactive
PO6 Stormwater runoff discharging into High Ecological Value mapping indicates that no High
Development is located, designed, constructed and operated waters as a result of development causes no increase in Ecological Value waters are
to protect and enhance environmental values and water
gross pollutants, total suspended solids, total phosphorous located within the development
quality of waterways, wetlands, lakes, ground waters and
drainage systems. or total nitrogen compared to a pre-development scenario. site.
AND Development will comply, Refer to
Editor’s note: Environmental values of waters and water Stormwater Management Plan, in
AO6.2
quality objectives are prescribed in Schedule 1 of the specific stormwater quality section
All stormwater runoff is treated to achieve maximum
Environmental Protection (Water) Policy 2009 and are prepared by this office.
identified on the State Planning Policy Interactive Mapping removal of nutrients, gross pollutants and suspended
System. solids as determined by cost to efficiency ratios. (e.g.
bioretention basins must be sized to achieve at least 80%
reduction in total suspended solids, 60% reduction in total
phosphorous, 45% reduction in total nitrogen and 90%
reduction in gross pollutants >5mm).
Page 4 of 11
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.