Original source · versioned page text
Appendix J - Civil Engineering Report and SBSMP
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
maintenance by Council, is cost effective across its design Design Standards - Roads, drainage and earthworks.
life.
AO4.2 Development will comply,
Where infrastructure is located on private land an easement stormwater Covent is dedicated
is dedicated over the infrastructure in accordance with PSP6 over the proposed point of
Engineering Design Standards - Roads, drainage and discharge consistent with the
earthworks. original subdivision approval.
AO4.3 To be complied with at detailed
Any alterations or repairs to infrastructure as a result of design / construction stages
the development are made at no cost to Council.
AO4.4 Development complies.
Development avoids stormwater inflow and infiltration to
the sewer infrastructure network.
AO4.5 Development will comply,
Stormwater infrastructure is designed to minimize stormwater covenant provides
maintenance costs and the requirement for specialized sufficient access for maintenance
equipment for maintenance techniques. purposes.
PO5 AO5.1 Development will comply, Noosa
Stormwater drainage infrastructure is aligned to avoid Stormwater drainage infrastructure avoids crossing Shire Council interactive mapping
crossing waterways, wetlands, drainage lines and waterways, wetlands drainage lines and ecologically indicates that no waterways,
ecological important areas, or where it is demonstrated this
important areas or follows the edge of existing disturbed wetlands drainage lines
is unavoidable, disturbed areas are reinstated and
revegetated upon completion of works. areas. and ecologically important areas
are located within the development
area.
Page 3 of 11
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.